  • Latest New School Construction Update

    Our students have moved into the dormitory which is on the top eight floors with its own entrance. The first day of classes was August 26th and a new semester is now underway. It is anticipated that the academic portion of the building (first eight floors) will be completed in time for this year’s second semester. We will keep you posted. Some of you can see our green roof which is also an exciting addition.

    Next week (September 9 to September 13), material and equipment deliveries and installation work will continue on the academic floors inside the building.

    The following week (September 16 to September 20), material and equipment deliveries and installation work will continue on academic floors.

  • Another High-End Gym Arrives

    Boasting two floors, three studios (including a heated one), and over 100 workouts per week, the flagship location of Fithouse off Union Square  garnered the attention of over 500 new members in its opening weekend alone. Combined with the diversity of class types (barre, bounce, dance, HIIT, sculpt, and yoga) and instructors’ notoriously noteworthy energizing playlists, it’s the ultimate spot to sweat and be seen. Spread across 6,400 square feet, the one-stop shop also provides luxe showers, private changing areas, lockers equipped with charging stations, and a full refresh bar. Unlimited class memberships are $189/month.

  • Latest New School Update

    Next week (November 7 to November 11), DOT approved street connections to underground utilities on Fifth Avenue and 13th street will continue. Superstructure work will continue at cellar, 1st, and 2nd floor levels. A sidewalk shed will be erected around the perimeter of the site.

    The following week (November 14 to November 18), we will continue superstructure concrete and slabs. Street utility connection work will continue. A street crane will be moved into position on 13th street to place structural steel in the building.

    This weekend the site will be open on Saturday, November 5th for superstructure related activities between the work hours of 9AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork, plumbing and electrical work, and rebar for concrete placement and use of the crane and equipment to support all activities.