Interesting….”Long regarded as a leader in New York’s fine-dining world, Danny Meyer is making moves into the casual ranks of the city’s culinary scene. The restaurateur’s Union Square Hospitality Group (USHG), which encompasses a range of high-price dining spots such as the Michelin-starred Gramercy Tavern and the Modern, is investing in Joe Coffee, a New York-based coffee chain with 13 locations in the city and two in Philadelphia.”

“Historically we’ve had the privilege of investing in some incredibly special companies whose cultures, leaders, and innovative business models caught our eyes, and Joe is no different,” said Danny Meyer, Chief Executive Officer of Union Square Hospitality Group. “USHG has had a meaningful relationship with Joe Coffee and founder Jonathan Rubinstein for many years, both as avid fans of their coffee bars and also having served their coffee at Union Square Events for years. We chose to make this investment with Joe Coffee because they are dedicated to the pursuit of making flawless coffee, are led by passionate and exceptional management, and share the same hospitality values as USHG.”

“We are incredibly proud and humbled that USHG and its affiliates have chosen to invest in Joe,” said Jonathan Rubinstein, Co-Founder and President of Joe Coffee. “Danny Meyer is a leader I have admired my entire professional career and to have the opportunity to partner with him and his outstanding team at Union Square Hospitality Group is a dream come true. With this new funding, we will continue to do what we love – roast, brew, and serve the best quality coffee with genuine hospitality – and now we are excited to bring Joe to even more great communities across the country.”

Similar Posts

  • Latest New School Construction Update

    In response to community concerns about the time in the evening we end our concrete placing, DOB has granted our request to start placing our concrete at 6am, which will allow us to finish this work earlier in the evening. We have 8 more instances like this until we finish our superstructure in early June.

    Therefore next week (April 16 to April 20), Superstructure work will continue at the 13th and 14th floor levels. Wednesday, April 18th, we will have an identical pour with a 6 am start time and similar end time, weather permitting. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.

    The following week (April 23 to April 27), we will continue superstructure concrete and slabs on the 15th and 16th floor levels. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.

    This weekend the site will be open on Saturday, April 14st for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork and concrete, plumbing and electrical work, rebar for concrete placement, using the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise.

    In addition to the normal work on the job site, the 14th St. Con Ed Vault utility connection street work will continue per DOT Permit granted for weekends only.

  • Ben Ness Gone

    Sad to see local photo store Ben Ness go. It was a good place to get passport phots done and was staffed with a nice bunch of guys. It will be interesting to see if the space goes to a local business or to a chain. Pinkberry perhaps?

  • Latest New School Construction Update

    Next week (September 10 to September 14), Material and equipment deliveries and installation work will continue on all floors. Curtain wall installation on upper floors will continue. Curtain wall installation on the lower floors will proceed along 5th ave inside the construction site.

    The following week (September 17 to September 21) Material and equipment deliveries and installation work will continue on all floors. Curtain wall installation will continue on all floors. Curtain wall installation on the lower floors will proceed along 5th ave inside the construction site.

    This weekend the site will be open on Saturday, September 8th for superstructure related activities and curtain wall installation between the work hours of 7AM and 5PM as permitted by the City. Con Ed is on site working on the building but is not in any of the streets.