Next week (October 8 to October 12), Material and equipment deliveries and installation work will continue on all floors. Curtain wall installation on upper floors will continue. Curtain wall installation on the lower floors will proceed along 5th ave inside the construction site. The crane that is on site will remain for the duration of curtain wall installation and will not affect pedestrian or automotive traffic.
The following week (October 15 to October 19) Material and equipment deliveries and installation work will continue on all floors. Curtain wall installation will continue on all upper floors. Curtain wall installation on the lower floors will proceed along 5th ave inside the construction site. The site will be open on Monday the 8th.
This weekend the site will be open on Saturday, October 6th for superstructure related activities and curtain wall installation between the work hours of 7AM and 5PM as permitted by the City. Con Ed will be working in the street.
The East 12th and 13th Street Block Association is fighting against the arrival of Caliente Cab Co. at University and 12th on the grounds that they expect it to be a noisy all-night boozefest. The owners had petitioned for 4AM closing 7 nights a week, open windows, and sidewalk cafe. They’ve backed off, but that’s still not good enough for those who are against it.
You can speak your mind at the licensing meeting on April 12th at 6PM at 268 Mulberry St.
The complete Community Board meeting is APril 21st at 6PM at 116 West 11th St.
This week (June 6-10), contractors will continue to excavate earth and rock, and load out material. We will complete the underpinning of the adjacent buildings. Installation of rakers, line drilling, lagging and sheeting around the perimeter will progress as well. Concrete foundation walls are scheduled to begin.
The following week, we will continue line drilling, rock excavation, and loading out, as well as lagging and sheeting.
Concrete foundation walls will progress.
Burlington Coat Factory, a leading national off-price retail chain, has announced today that it will open a new flagship store in the space formerly occupied by Filene’s. Burlington offers brand name merchandise for the entire family and home with up to 65% off department store prices every day. The new location will feature the latest trends in ladies’ dresses, suits, sportswear, juniors, accessories, menswear, family footwear and children’s clothing. It will also include a broad assortment of furniture and accessories for baby at Baby Depot, home decor and gifts, along with the largest selection of coats in the nation.
Regale Deli, on 5th Ave. north of 14th St., has closed. It was always a little dark and spooky, but it was popular, and now there is one less convenient deli in the neighborhood. If University Deli on the corner of 13th closes, we’re doomed.
Mid block between 5th and 6th Aves. will be the local of a new 133-room hotel. It’ll be interesting to see how they squeeze it in. Here are the details.