New School Building Design Update

As you’re well aware, the demolition and construction of The New School site at 65 Fifth Avenue is well underway. On Thursday, The New School revealed for the first time the official design of the building, which includes some of the elements from its earliest sketches, such as the exposed staircases, but is different in two notable ways: the building is smaller than originally planned, and it is partially class in brass, rather than entirely in glass.

The building is being constructed as of right. There is no more debate over design or size. This is pretty much what we’re going to see: a university hub of about 16 stories with eight floors of campus space topped by a smaller eight floors of dormitory housing for 600 students.

To get caught up on what the building looks like and see many photos of the model, click here.

To read the somewhat positive New York Times architecture critic’s review, click here.

A neighbor attended the public viewing of the model and came away with some great facts:

–The loading dock is on 13th street at the eastern most corner of the lot.

–The main entrance to the building is on the southwest corner. This is for everything except the dormitories.

–The dormitory entrance is on 5th avenue, about 1/3 of the way down from 14th street.

–The northern 1/3 of the building at street level is retail – no word on what though.

–Directly above the retail is a cafeteria. It looks like seating for 300, which makes sense considering the 600 person dormitory.

–The dormitory floors are set back on all sides, and shaped in a ‘C’ with a light well on the eastern side of the stack. They are four bed suites, with kitchenettes in them.

–The set-back between the lower and upper halves is a green roof, and they say that for liability reasons it will not be open to the general building population. Pressing on this, and the answer was that while the green roof hasn’t been engineered yet, it is likely going to be possible to have foot traffic on it and will perhaps be open to supervised use (during a class, or for an experiment of some kind). (So no midnight keg parties, we hope.)

The green roof is at the level of 7 East 13th St/10 East 14th St, so about the same height as our roof.

— It looks like it’s designed to keep students inside the building, and not loitering on the street. The canopies are small, and the doors aren’t inset, so there isn’t any natural gathering space just outside on the sidewalk.

We hope that this brings everyone up to date on a project that will be a big part of the pulse of the neighborhood for the next two years….and beyond.

Similar Posts

  • A Proposal for Significant Enhancements Around the Edges of Union Square

    The Union Square Partnership has proposed a wide-ranging collection of enhancement to remake Union Square Park, expanding its edges into the surrounding streets to make it a much bigger and more attractive pedestrian-oriented area. Click through the links in their letter below to see much more. 

    They write:

    The Union Square Partnership is proud to announce the release of the Union Square-14th Street District Vision Plan: a bold new vision for transforming Union Square-14th Street into New York’s most accessible space.

    The Wall Street Journal ran an exclusive today showcasing the Vision Plan, stating “…the plan’s ultimate goal is for parkgoers to know they have ‘arrived at a place that is special.'” Read the full article here.  

    Building upon USP’s past investments, including the renovation of Union Square Park’s north end, City initiatives like Parks Without Borders, the 14th Street Busway, and the pedestrianization of Broadway, along with the more than one million square feet of new private development underway, our Vision Plan focuses on five key improvements prioritizing accessibility, district-wide connectivity, and substantial increases in public open space.

    Designed in collaboration with Marvel, the Vision Plan is the culmination of a two-year-long engagement process working with community members, local business leaders, urban designers, transportation experts, and City and State agency partners. With over a thousand individuals engaged at twenty separate engagement events, it was the largest outreach effort in the Partnership’s 45-year history.

    We are sure you will have questions and feedback about the Vision Plan and there will be many opportunities to learn more. The first is our official Vision Plan: Launch Event hosted in collaboration with the Urban Design Forum on Tuesday, January 26th at 12:00 PM. Please RSVP here.

    Next, we will be hosting a series of Vision Plan: Community Conversations via Zoom to facilitate more robust discussions and gather feedback. Dates + times will be announced soon but you can express interest in attending a session here.

    To familiarize yourselves with the plan, we have launched a dedicated web page with a robust amount of detailed information about the Union Square-14th Street District Vision Plan. Click on the link below to download and read the full report, our info sheet, and press release, as well as view the annotated renderings. There is also an FAQ, which hopefully will address most of your initial questions. You can explore more via unionsquarenyc.org/vision.

    We look forward to fostering dialogue in the coming months that will guide our investments and set future priorities. It is my hope that as you review the Vision Plan that you will feel the impact of our collaborative community process and continue to share feedback as we move forward to the next stage.

  • Latest Construction Update: More of the Same

    “Next week (August 1 to August 5), Contractors will continue to excavate earth and rock, and load out material. Installation of bracing rakers, line drilling, lagging and sheeting around the perimeter will progress as well. Concrete foundation walls will continue along the perimeter of the site. Final adjustments to the access ramp within the site are ongoing. As early as Thursday, July 28th, the construction fence along the North end Fifth Avenue will be relocated to the curb line with pedestrians diverted to a walkway in the street as approved by the Department of Transportation. The following week (August 8 to August 12 ), we will continue with concrete foundation walls, line drilling, rock excavation, and loading out, as well as lagging and sheeting. DEP will continue to work on the water main along 13th Street. The site will be open on Saturday, July 30th. Work hours are between 9AM and 5PM as permitted by the City. To control noise levels, work activities will be limited to the placement of formwork and rebar for concrete placement, wood lagging, and installation of walers and braces. There will be no rock excavation, rock chopping, or hauling on Saturday.”

  • Latest New School Construction Update

    Next week (February 25 to March 1), material and equipment deliveries and installation work will continue on all floors inside the building as well as roof work. Additionally we will begin work on the new sidewalks around the building. We have begun dismantling the construction hoist on the building exterior and will continue to do so for the upcoming weeks.

    The following week (March 4 to March 8), material and equipment deliveries and installation work will continue on all floors and roofs as well as sidewalk work.

    This weekend the site will be open on Saturday, February 23rd for interior, superstructure, sidewalk, and hoist removal related activities between the work hours of 7AM and 5PM as permitted by the City.