New School Building Design Update

As you’re well aware, the demolition and construction of The New School site at 65 Fifth Avenue is well underway. On Thursday, The New School revealed for the first time the official design of the building, which includes some of the elements from its earliest sketches, such as the exposed staircases, but is different in two notable ways: the building is smaller than originally planned, and it is partially class in brass, rather than entirely in glass.

The building is being constructed as of right. There is no more debate over design or size. This is pretty much what we’re going to see: a university hub of about 16 stories with eight floors of campus space topped by a smaller eight floors of dormitory housing for 600 students.

To get caught up on what the building looks like and see many photos of the model, click here.

To read the somewhat positive New York Times architecture critic’s review, click here.

A neighbor attended the public viewing of the model and came away with some great facts:

–The loading dock is on 13th street at the eastern most corner of the lot.

–The main entrance to the building is on the southwest corner. This is for everything except the dormitories.

–The dormitory entrance is on 5th avenue, about 1/3 of the way down from 14th street.

–The northern 1/3 of the building at street level is retail – no word on what though.

–Directly above the retail is a cafeteria. It looks like seating for 300, which makes sense considering the 600 person dormitory.

–The dormitory floors are set back on all sides, and shaped in a ‘C’ with a light well on the eastern side of the stack. They are four bed suites, with kitchenettes in them.

–The set-back between the lower and upper halves is a green roof, and they say that for liability reasons it will not be open to the general building population. Pressing on this, and the answer was that while the green roof hasn’t been engineered yet, it is likely going to be possible to have foot traffic on it and will perhaps be open to supervised use (during a class, or for an experiment of some kind). (So no midnight keg parties, we hope.)

The green roof is at the level of 7 East 13th St/10 East 14th St, so about the same height as our roof.

— It looks like it’s designed to keep students inside the building, and not loitering on the street. The canopies are small, and the doors aren’t inset, so there isn’t any natural gathering space just outside on the sidewalk.

We hope that this brings everyone up to date on a project that will be a big part of the pulse of the neighborhood for the next two years….and beyond.

Similar Posts

  • Latest New School Construction Update

    Next week (December 17 to December 21), material and equipment deliveries and installation work will continue on all floors inside the building.

    The following week (December 24 to December 28), Material and equipment deliveries and installation work will continue on all floors. The site will be closed on December 25th for the holiday but will be open on Monday the 24th and Wednesday the 26th.

    This weekend the site will be open on Saturday, December 15th for interior and superstructure related activities between the work hours of 7AM and 5PM as permitted by the City.

  • Recycle Clothing in Union Sq. Park

    Did you know that 5.7% of NYC’s residential waste is textiles, yet they are 100% recyclable? Recycle your unwanted textile materials at the Union Square Greenmarket every Monday, 8 a.m. – 6 p.m. Acceptable donations include used clothing, shoes, boots, hats, jackets, towels, bedding, and linens. Council on the Environment of New York City will provide receipts upon request for those who may want to use their donation as a charitable contribution. Visit www.cenyc.org to obtain up to date information on the status of the Material Mondays textile collection program. Now Saturdays too!

  • Latest New School Construction Update

    Next week (May 6 to May 10), material and equipment deliveries and installation work will continue on all floors inside the building. We will be working on the new sidewalks around the building and installing new curbs. Additionally we will be working on the roofs of the building.

    The following week (May 13 to May 17), material and equipment deliveries and installation work will continue on all floors as well as sidewalk work.

    This weekend the site will be open on Saturday, May 4th for interior, roof, and sidewalk activities between the work hours of 7AM and 5PM as permitted by the City.