Certified Closed: Maximo Pino
Closed at the corner of 13th and 6th. Probably because for take out, the food was too pricey. Wonder what will fill that cursed space next.
In response to community concerns about the time in the evening we end our concrete placing, DOB has granted our request to start placing our concrete at 6am, which will allow us to finish this work earlier in the evening. We have 8 more instances like this until we finish our superstructure in early June.
Therefore next week (April 16 to April 20), Superstructure work will continue at the 13th and 14th floor levels. Wednesday, April 18th, we will have an identical pour with a 6 am start time and similar end time, weather permitting. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.
The following week (April 23 to April 27), we will continue superstructure concrete and slabs on the 15th and 16th floor levels. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.
This weekend the site will be open on Saturday, April 14st for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork and concrete, plumbing and electrical work, rebar for concrete placement, using the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise.
In addition to the normal work on the job site, the 14th St. Con Ed Vault utility connection street work will continue per DOT Permit granted for weekends only.
The team behind the world-famous Union Square Greenmarket, GrowNYC, just launched Project Farmhouse, an event space and sustainability center that hosts workshops, galas, speakers, community meetings and interactive exhibits. The new space is located on 13th Street, on the ground floor of the Hyatt Union Square.
Word is that the neighborhood’s first 7-11 convenience store will move in on 14th St. near 6th Ave.
No one is sure why, but Ramen Setagaya has changed its name to Takumi Ramen. Same menu.
Reminder: the co-op’s annual meeting takes place on Monday, January 30, at 7PM at the International Seafarer’s House, 123 East 15th St. second floor (take the stairs to the right of the entrance for easiest access).