Latest Construction Update: Even More of the Same

Next week (August 8 to August 12), Contractors will continue to excavate earth and rock, and load out material. Installation of bracing rakers, line drilling, lagging and sheeting around the perimeter will progress as well. Concrete foundation walls will continue along the perimeter of the site. Interior core foundation work will proceed. The following week (August 15 to August 19 ), we will continue with concrete foundation walls, line drilling, rock excavation, loading out,and interior core foundation work & underground plumbing. DEP will continue to work on the water main along 13th Street. The site will be open on Saturday, August 6th. Work hours are between 9AM and 5PM as permitted by the City. To control noise levels, work activities will be limited to the placement of formwork and rebar for concrete placement, wood lagging, and installation of walers and braces. There will be no rock excavation, rock chopping, or hauling on Saturday.

Similar Posts

  • In Happier News, A New Tea Shop

    Visit Koi, at 32 Union Square East. They say:

    A celebration, a date or just a relaxing break in the day, there is always a reason to get together around a cup of KOI tea. KOI brings joy to the world. Freshly brewed tea and flavorful ingredients, prepared with passion are the key to KOI’s authentic taste and the reason why people come back again and again. In each and every KOI store, the staff is keen to share our happiness and love of tea with you. They do their best every day to make your experience memorable. Hear the sound of tea being brewed, of ice being crushed, and of laughter. Smell the aroma of our freshly prepared ingredients. Be excited by the chewiness of our milk tea pearls. Enjoy the fun and comfortable surroundings. And the warmth of our tea shakers. With KOI, happiness happens naturally.

  • Latest New School Construction Update

    Next week (January 14 to January 18), material and equipment deliveries and installation work will continue on all floors inside the building as well as roof work. Additionally we will begin work on the new sidewalks around the building.

    The following week (January 21 to January 25), Material and equipment deliveries and installation work will continue on all floors and roofs as well as sidewalk work. We will begin dismantling the sidewalk shed on 14th street at the end of the month.

    This weekend the site will be open on Saturday, January 12th for interior and superstructure related activities between the work hours of 7AM and 5PM as permitted by the City.