Similar Posts

  • Lastest New School Construction Update

    Next week (November 14 to November 18), DOT approved street connections to underground utilities on Fifth Avenue and 13th street will continue. Superstructure work will continue at cellar, 1st, and 2nd floor levels. A street crane will be moved into position early on Wednesday the 11/16 on 13th street to place structural steel in the building and should be out by the end of the day, weather pending.

    The following week (November 21 to November 25), we will continue superstructure concrete and slabs. Street utility connection work will continue. Sidewalk sheds will continue being erected around the perimeter of the site. The project will be closed on Thanksgiving Day, 11/24, and open for work on 11/25.

    This weekend the site will be open on Saturday, November 12th for superstructure related activities between the work hours of 9AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork, plumbing and electrical work, rebar for concrete placement and use of the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise.

  • Union Square Partnership’s Annual Report Has Arrived

    To get a sense of the pulse of the neighborhood, check out the USP’s ANNUAL REPORT. It’s full of interesting plans and action items, such as:

    Public Space Activations: This summer, USP is rolling
    out new seating areas, enhanced landscaping, the
    second annual mural along the 14th Street Busway,
    and hosting an Oonee Pod Mini, a prototype for safe
    bike storage.

    Park Upgrades: In partnership with NYC Parks, USP
    will develop a Union Square Park infrastructure
    plan that includes upgraded utilities, irrigation, and
    bathrooms amenities, as well as a preservation plan
    of the entire district’s tree canopy.

    Since January 2021, 46 new businesses have opened in and around Union Square.

  • Latest New School Construction Update

    Next week (May 20 to May 24), material and equipment deliveries and installation work will continue on all floors inside the building. We will be working on the new sidewalks around the building and installing new curbs and will be removing the sidewalk shed along 13th st. Additionally we will be working on the roofs of the building.

    The following week (May 27 to May 31), material and equipment deliveries and installation work will continue on all floors as well as sidewalk work.

    This weekend the site will be open on Saturday, May 18th for interior, roof, and sidewalk activities between the work hours of 7AM and 5PM as permitted by the City.