Similar Posts
Forever No More
ByDonForever 21, on the corner of University and 14th St., has shuttered. It’s a prime location, and it will be interesting to see what shows up next.
Union Square Partnership Gathers Resident Opinions
ByDonHow do you feel about Union Square. The Union Square Partnership does an annual opinion survey to find out. Some thoughts from the results:
FOSTERING A THRIVING ECONOMY IN USQ
USP asked respondents to share the types of businesses
they would like to see in Union Square. Half of respondents
would like to see more cultural institutions (50%),
followed by art galleries/exhibitions (48%), and cafés/
coffee shops (47%). Many respondents mentioned wanting
to see more local businesses — including small, curated
stores, non-chain coffee shops and eateries, and specialty
grocery stores. This feedback highlights a strong community
interest in maintaining a vibrant retail environment in
Union Square rooted in unique, local offerings.ENHANCING LIVABILITY IN USQ
USP is committed to keeping Union Square clean, safe, and
beautiful. The majority of respondents are satisfied (very
satisfied and somewhat satisfied) across key metrics of
USP’s work enhancing livability. Respondents reported the
highest levels of satisfaction with the landscaping of Union
Square Park (87%), planter landscaping (87%), Broadway Plaza
maintenance (85%), and public seating areas (77%). While
most respondents remain pleased with the district’s upkeep,
some expressed a desire for extended hours and seasonality
for the public seating areas as well as improved lighting,
especially in Union Square Park and surrounding streets.
Following USP’s 2023 launch of the Public Safety Officer
(PSO) program, perceptions of public safety improved by
15 points in the 2024 survey. The 2025 survey results show
that this perception has largely stabilized, with 87% of
respondents noting that their perception of public safety
in USP’s Core Services Area (CSA) has improved or seen
no change over the past year. Moreover, the percent of
respondents reporting concerns around public safety within
the CSA decreased by 15% in 2025 compared to 2024.The New School Site Used to Be Thomas Edison’s Lab
ByDonSome fun history about 65 5th Ave.
“The New School has been a presence at 65 Fifth Avenue, the site of the University Center, since 1967, when the university converted a Lane’s department store building for student use. But long before the address became associated with educational innovation, it was renown for innovation of another kind. In 1881, inventor Thomas Edison installed at the address (which was then occupied by a handsome brownstone) a permanent exhibition of his electrical discoveries. The biography Edison: His Life and Inventions reports that “the house was thrown open to the public until late at night, never closing before ten o’clock, so as to give everybody who wished an opportunity to see that great novelty of the time—the incandescent light—whose fame had meanwhile been spreading all over the globe.” It is a fitting legacy for the University Center, which upon opening in Fall 2013 will itself serve as a living teaching tool, with exposed energy and water management systems to provide working demonstrations of sustainable design.”
Latest New School Construction Update
ByDonNext week (July 16 to July 20), Mechanical equipment deliveries and work on them will continue at the 17th and 18th floor levels. Deliveries for the internal systems of the building have been ongoing and will continue. Curtain wall installation will continue.
The following week (July 23 to July 27), we will be working on the machine room levels on the 17th and 18th floors. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.
This weekend the site will be open on Saturday, July 14th for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork and concrete, plumbing and electrical work, rebar for concrete placement, using the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise.




