Latest New School Construction Update
ByDonNext week (March 19 to March 23), Superstructure work will continue at the 8th floor level. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.
The following week (March 26 to March 30), we will continue superstructure concrete and slabs on the 8th and 9th floor levels. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.
This weekend the site will be open on Saturday, March 17th for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork and concrete, plumbing and electrical work, rebar for concrete placement, using the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise.
In addition, tomorrow, Friday the 16th, we will be starting operations at 6am in anticipation of a large concrete pour and will more than likely, with notification of the Department of Buildings, be going later into the evening to finish. Also on the weekend of the 10th the 14th St. Con Ed Vault utility connection street work will continue per DOT Permit granted for weekends only.
Latest New School Construction Update
ByDonNext week (September 17 to September 21), Material and equipment deliveries and installation work will continue on all floors. Curtain wall installation on upper floors will continue. Curtain wall installation on the lower floors will proceed along 5th ave inside the construction site. To aid in the installation of the lower level curtain wall a crane will be arriving on site Monday, the 17th. The crane will be inside the construction perimeter and will not affect pedestrian or automotive traffic.
The following week (September 17 to September 21) Material and equipment deliveries and installation work will continue on all floors. Curtain wall installation will continue on all floors. Curtain wall installation on the lower floors will proceed along 5th ave inside the construction site.
This weekend the site will be open on Saturday, September 15th for superstructure related activities and curtain wall installation between the work hours of 7AM and 5PM as permitted by the City. Con Ed is on site working on the building but is not in any of the streets.
TGI Fridays Becomes Co-Working Space
ByDonThe former TGI Fridays on Union Square East will become a standalone site for Spacious, the co-working space that already operates within Corkbuzz from 8-4 every day. Details here.
Latest New School Construction Update
ByDonNext week (October 14th to October 18th), material and equipment deliveries and installation work will continue on the academic floors inside the building.
The following week (October 21st to October 25th), material and equipment deliveries and installation work will continue on academic floors.
This weekend the site will be open on Saturday, October 12th for interior activities between the work hours of 7AM and 5PM as permitted by the City.