Now Open: Greek Taverna
On University Place a few blocks down. And it appears to be very popular. Good desserts.
This wonderful interactive map lets you explore the history of most of the buildings in our neighborhood.
7:00 AM Morning Running Club with Paragon Sports (Fitness)
7:00 AM Boot Camp with Circuit of Change (Fitness)
8:00 AM Yoga with Jivamukti (Fitness)
10:00 AM Yoga StoryTime with Karma Kids (Kids)
11:00 AM Hot Peas ‘n Butter (Kids)
12:00 PM New School Jazz (Music)
5:00 PM Performance by Peridance Contemporary Dance Company (Music)
6:00 PM Club Dance with Peridance (Dance)
A tempting lineup of sandwiches awaits at the compact new Make Sandwich shop from Spencer Rubin, who owns the Melt Shop chain. He hired Josh Sharkey, the founder of Bark Hot Dogs, as culinary director. The nine preset sandwich combinations, like tri-tip steak with salsa verde, range in price from $7.95 to $11.95. All sandwiches are made to order in five to seven minutes with ingredients like Parmigiano-Reggiano, organic eggs and Pain d’Avignon bread. You can devise your own from a long list of choices for $10.95, with extra charges for some toppings: Make Sandwich, 135 Fourth Avenue (at 14th Street), 212-398-2602, makesandwich.com.
“Next week (August 1 to August 5), Contractors will continue to excavate earth and rock, and load out material. Installation of bracing rakers, line drilling, lagging and sheeting around the perimeter will progress as well. Concrete foundation walls will continue along the perimeter of the site. Final adjustments to the access ramp within the site are ongoing. As early as Thursday, July 28th, the construction fence along the North end Fifth Avenue will be relocated to the curb line with pedestrians diverted to a walkway in the street as approved by the Department of Transportation. The following week (August 8 to August 12 ), we will continue with concrete foundation walls, line drilling, rock excavation, and loading out, as well as lagging and sheeting. DEP will continue to work on the water main along 13th Street. The site will be open on Saturday, July 30th. Work hours are between 9AM and 5PM as permitted by the City. To control noise levels, work activities will be limited to the placement of formwork and rebar for concrete placement, wood lagging, and installation of walers and braces. There will be no rock excavation, rock chopping, or hauling on Saturday.”