Summer in the Square Events

It’s all happening in Union Square’s south plaza:

July 10th
5:30 PM – TheaterMania.com Presents an Off-Broadway Review

July 17th
5:30 PM – The John Malino Band

July 24th
5:30 PM – The Nashville Attitude

July 31st
5:30 PM – Jukebox the Ghost

August 7th
5:30 PM – Virgin Presents World Music Night

August 14th
5:30 PM – Virgin Presents World Music Night II

Similar Posts

  • New School Construction: More of the Same

    This week (June 6-10), contractors will continue to excavate earth and rock, and load out material. We will complete the underpinning of the adjacent buildings. Installation of rakers, line drilling, lagging and sheeting around the perimeter will progress as well. Concrete foundation walls are scheduled to begin.

    The following week, we will continue line drilling, rock excavation, and loading out, as well as lagging and sheeting.

    Concrete foundation walls will progress.

  • How Do People FEEL About Union Square?

    The Union Square Partnership has released its latest annual survey of people’s opinions about our neighborhood’s livability in terms of cleanliness, safety, landscaping, lighting, and quality of life. It makes for an interesting read. One highlight:

    “USP is committed to enhancing livability in the Union Square 14th Street district through its Clean + Safe program. According to the 2024 survey results, satisfaction for district conditions improved or remained consistent compared to 2023 results, with satisfaction for public safety increasing by 15%. This notable increase follows USP’s deployment of Public Safety Officers (PSOs) in June 2023, and survey respondents noted that their patrols have had a positive impact in Union Square Park and the playground. Despite this improvement, respondents dissatisfied with the conditions expressed ongoing safety, sanitation, and quality of life concerns around the district, including the lack of City enforcement and City services for those in need. USP is dedicated to continuing investment in the PSO program and increasing coordination with City agencies and law enforcement in response to the community’s quality of life concerns.”

  • Chat N Chew Goes Italian

    Comfort food joint Chat ‘n Chew shut its doors this week after 22 years in the neighborhood, but the owner plans to reopen it as an Italian restaurant.

    The diner-style eatery at 10 E. 16th St. near Fifth Avenue will relaunch in two weeks as Little Sal’s, said Ethan Silverman, son of owner Andrew Silverman.

    “[Chat ‘n Chew] lost some of it’s energy, and now we’re getting it back,” Ethan Silverman said. “It’s going to be a Chat ‘n Chew on steroids. It’ll have traditional Italian food like chicken parm, eggplant parm and pastas.”

    Silverman compared the concept of Little Sal’s to New York City restaurants like Sauce and Parm, where it’s “casual and family oriented — selling wine by the glass and not the bottle,” he said.

    Andrew Silverman also co-owns Flatiron’s City Crab and Barbounia restaurants.

    Little Sal’s will open as a pop-up in two weeks for a test run, and may remain open permanently depending on how well it does, Silverman said.

    As for Chat ‘n Chew’s abrupt closure, Silverman said the team had known that they would be closing for a while, but hadn’t made it public.

    “If people took a look at the place recently, they’d see that the staff was slowly kind of diminishing,” Silverman said.

    “We’ve been in Union Square for a while, and we’re going to come back with energy,” he continued. “But [the concept] will be [in] keeping with the people who work and live in the neighborhood.”

  • Latest New School Construction Update

    Next week (November 21 to November 25), DOT approved street connections to underground utilities on Fifth Avenue and 13th street will continue. Superstructure work will continue at cellar, 1st, and 2nd floor levels. Sidewalk sheds will continue being erected around the perimeter of the site. The project will be closed on Thanksgiving Day, 11/24, and open for work on 11/25 and 11/26, weather pending. The following week (November 28 to December 2), we will continue superstructure concrete and slabs. Street utility connection work will continue.