Union Square Could Be Swarmed on May Day
Early rumors suggest that Union Square will become the center of Occupy-related protests on May 1.
Dear Board Members, Residents, & Building Staff,
While we are enjoying the nice rain-free weather lately, New York experienced truly little rainfall in October. In fact, it is the second-longest dry spell we have seen in 155 years. This means we are potentially facing water shortages if either the weather does not change and/or we do not cut back on water usage. This past Saturday, Mayor Adams asked city agencies to implement “water savings plans” and suggested that New Yorkers consider cutting back at the tap. While his announcement does not mandate any restrictions on water use, we want to be mindful of the situation. And as we manage hundreds of properties in the five boroughs, we feel it is important to pass along this message. For New Yorkers living in AKAM managed properties interested in doing their part, please consider the following water-saving measures:
In the Bathroom:
In the Laundry Room/ Kitchen:
Outside:
Other:
Bak Korean Kitchen, which shared our building on 13th St., i\s no more. It was the fifth restaurant in that location in eight years. However, the Karaoke Cave downstairs is undergoing renovation and will reopen.
The new Hyatt Hotel at 4th Ave. and 13th St. is coming together.
From the Greenwich Village Society for Historic Preservation:
NYU recently revealed its draft Environmental Assessment Statement and draft Scoping Document for its massive proposed zoning changes and taking of public land to allow its planned twenty-year expansion in Greenwich Village. These documents provide greater detail about what NYU is planning, what the potential impacts are of their proposed changes, and how NYU will be required to analyze those impacts for the public review process of their application.
Community Board #2 will be holding a public hearing on the documents and the response to them on Thursday, May 5 (time and location TBD). Following the Community Board hearing, the City Planning Commission will hold a hearing before the documents are finalized and the review and analysis takes place. This process is expected to take several months. After that, the public hearing, review, and approval process for the actual proposed zoning changes and transfers of public land may take place.
Next week (December 5 to December 9), DOT approved street connections to underground utilities on Fifth Avenue will continue. Superstructure work will continue at 1st and 2nd floor levels. Sidewalk sheds will continue being erected around the perimeter of the site. The following week (December 12 to December 16), we will continue superstructure concrete and slabs. Street utility connection work will continue.
This weekend the site will be open on Saturday, December 3rd for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City.