Drunk Barhoppers Mess Up 15th St. Garden?

Let’s hope the crowd at Sidebar doesn’t find its way to our side of the park to wreak havoc.

Similar Posts

  • Union Square Retail Is Doing Well These Days

    The Union Square district’s momentum has increased recently.

    As measured by the Union Square Partnership, retail storefront occupancy of 82% in April — a 68% jump over the last quarter of 2024 — has since hit 88.5%, propelled by large recent leases such as Uniqlo’s deal for over 19,000 square feet at 860 Broadway.

    More than 17,000 square feet of retail was leased in the second quarter, more than seven times the volume in the second quarter of 2024. Leading the food-and-beverage charge is Time Out Market, which will soon replace Urbanspace with a 10,000 square-foot hall on the ground floor of Zero Irving. It will be a smaller version of the DUMBO original.

  • Latest New School Construction Update

    DOB has granted our request to start placing our concrete at 6am, which will allow us to finish this work earlier in the evening. We have 3 more instances like this until we finish our superstructure in early June. Friday, May 4 we will have a pour at the 16th floor with a 6am start time and similar end dime, weather permitting.

    Therefore, next week (May 7 to May 11), Superstructure work will continue at the 17th floor level. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.

    The following week (May 14 to May 18), we will continue superstructure concrete and slabs on the 17th floor and roof levels. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.

    This weekend the site will be open on Saturday, May 5th for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork and concrete, plumbing and electrical work, rebar for concrete placement, using the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise. In addition to the normal work on the job site, we will have an additional crane on site at 5th ave. to install the stair trusses on the west side of the building. The crane will be completely on site and should not interfere with pedestrian or automotive traffic in the area.