Latest New School Construction Update

Next week (April 22 to April 26), material and equipment deliveries and installation work will continue on all floors inside the building. We will be work on the new sidewalks around the building as well.

The following week (April 29 to May 3), material and equipment deliveries and installation work will continue on all floors.

This weekend the site will be open on Saturday, April 20th for interior and sidewalk activities between the work hours of 7AM and 5PM as permitted by the City.

Similar Posts

  • Zoning Changes in the Area

    NYC’s zoning for businesses has recently changed, allowing for a wider range of retail and experiential offerings. In Union Square, this means new opportunities to lease to unique amusement and recreation facilities, live entertainment establishments and clean production and maker spaces. This bolsters the emerging trends in Union Square, where new nightlife hotspots like Midnight Blue and Upright Citizens Bridge have established
    roots alongside a cluster of experiential retail arcades like Boba Box, Sweet Cats Cafe, and Partea. And with the much anticipated 2025 opening of the darts-centric bar Flight Club at 31 Union Square West, Union Square is poised to be at the center of this new wave of ground-floor leasing enabled by the modernized zoning code.

  • Latest Construction Update: Even More of the Same

    Next week (August 8 to August 12), Contractors will continue to excavate earth and rock, and load out material. Installation of bracing rakers, line drilling, lagging and sheeting around the perimeter will progress as well. Concrete foundation walls will continue along the perimeter of the site. Interior core foundation work will proceed. The following week (August 15 to August 19 ), we will continue with concrete foundation walls, line drilling, rock excavation, loading out,and interior core foundation work & underground plumbing. DEP will continue to work on the water main along 13th Street. The site will be open on Saturday, August 6th. Work hours are between 9AM and 5PM as permitted by the City. To control noise levels, work activities will be limited to the placement of formwork and rebar for concrete placement, wood lagging, and installation of walers and braces. There will be no rock excavation, rock chopping, or hauling on Saturday.

  • Opening and Closing

    Opening: A Steve Madden shoe boutique north of Union Square on Broadway, a new high-end Japanese restaurant at 13th and 3rd, and Tong Thai Brasserie right across University on 13th.

    Closing: That great magazine shop at the corner of 6th Ave. and 11th Street, which is very sad.