Latest New School Construction Update

Next week (September 16 to September 20), material and equipment deliveries and installation work will continue on the academic floors inside the building.

The following week (September 23 to September 27), material and equipment deliveries and installation work will continue on academic floors. This weekend the site will be open on Saturday, September 14th for interior activities between the work hours of 7AM and 5PM as permitted by the City.

Similar Posts

  • Corner of 6th and 14th May See Change

    530-Sixth-Gary-BarnettFrom The Real Deal:

    Extell Development is in talks to buy a Greenwich Village commercial property with substantial development rights from the Duell family, the latest of several deals between the two. Gary Barnett’s firm is looking to acquire 530 Sixth Avenue on the corner of West 14th Street in Greenwich Village, Crain’s reported, citing a source familiar with the deal. The site is currently home to a 17,000-square-foot commercial building housing a Moscot Eyewear store, but public records show it has nearly 127,000 square feet of residential air rights.

    Extell and the Duells have struck a number of deals in the past two months. In December, Barnett’s company bought two apartment buildings at 116 Seventh Avenue and 204 West 17th Street in Chelsea from the Duells, paying $11 million. He also bought 502 Third Avenue, a rental and retail building in Murray Hill, from the family for $11 million around the same time. Barnett also seems to be the buyer in the $20 million purchase of a rental building at 27 Washington Square North in the Greenwich Village last month, according to Crain’s. At the time of the purchase, the buyer wasn’t known. [Crain’s] – Ariel Stulberg

  • Latest New School Construction Update

    Next week (December 24 to December 28), material and equipment deliveries and installation work will continue on all floors inside the building. The site will be closed on December 25th for the holiday but will be open on Monday the 24th and Wednesday the 26th.

    The following week (December 31 to January 4), Material and equipment deliveries and installation work will continue on all floors.

    This weekend the site will be open on Saturday, December 22nd for interior and superstructure related activities between the work hours of 7AM and 5PM as permitted by the City.

  • New Private Middle School to Open at 5th and 14th

    A private middle school partially funded by Facebook founder Mark Zuckerberg has released renderings of its planned interior — which is slated to open near Union Square this fall.

    AltSchool, a private school that uses a technology-driven approach to design individualized lesson plans for students, has started building out its new school at 90 Fifth Ave. on the corner of 14th Street.

    The school, which charges about $30,000 tuition per year, revolves around a Montessori-like curriculum and bills itself as a hybrid tech company and education startup. It’s the brainchild of a team of Silicon Valley types with a long history in companies like Google, where AltSchool CEO Max Ventilla worked for more than a decade.

    The new space takes up an office-building floor previously occupied by The New School. It will be divided into two main areas — each of which have a classroom and group area space, as well as a larger communal area with a small kitchenette, a lunch area, and amphitheater-style seating.

  • The Latest Construction Update

    The New School says:

    Next week (August 29 to September 2), Contractors will continue to excavate earth and rock, and load out material. Installation of bracing rakers and line drilling will progress as well. Concrete foundation walls will continue along the perimeter of the site. Interior core foundation work and underground electrical and plumbing will proceed. Contractors will be removing the interior earth ramp. A small cherry picker crane will be delivered to the site next week and will be stationed inside the Construction fence. This crane will remain there for approximately two months.

    The following week (September 6 to September 9 ), we will continue with concrete foundation walls, line drilling, rock excavation, loading out, interior core foundation work, and underground electrical and plumbing. Concrete pours for the slab on grade are anticipated to start this week. The site will be closed for Labor Day weekend (Saturday, Sept. 3 through Monday, Sept. 5).

    DEP will continue to repair the water main along 13th Street. As part of this work, the DEP may periodically shut water service off. This work is out of our control.