Next week (April 11 to April 15), Contractors will continue to excavate earth and rock, and load out material. We will continue to underpin both adjacent buildings with DOB approval of our means and methods. Drilling of tie-backs, lagging and sheeting around the perimeter will progress as well. The following week (April 18 to April 23), we will continue rock excavation and loading out, as well as underpinning both adjacent buildings, lagging and sheeting.
They are dropping like flies. Goodbye to Nanoosh, Nix, Blue Stripes, Le Midi (in our building) Le Maison de Croque Monsieur, and more. What will replace them?
Next week (October 21st to October 25th), material and equipment deliveries and installation work will continue on the academic floors inside the building and we anticipate paving on 5th Ave.
The following week (October 28th to November 1st), material and equipment deliveries and installation work will continue on academic floors.
This weekend the site will be open on Saturday, October 19th for interior activities between the work hours of 7AM and 5PM as permitted by the City.
Basics Hardware is gone. University Place is changing quickly.
Next week (August 20 to August 24), Material and equipment deliveries and installation work will continue on all floors. Curtain wall installation on upper floors will continue and lower levels will continue on 13th st. with the aid of a small crane. The crane will remain on 13th st. for the purpose of curtain wall installation.
The following week (August 27 to August 31) Material and equipment deliveries and installation work will continue on all floors. Curtain wall installation will continue on all floors. Work on 13th st should be complete by the end of this week and will be moved to 5th ave. to continue wrapping the building.
This weekend the site will be open on Saturday, August 25th for superstructure related activities and curtain wall installation between the work hours of 7AM and 5PM as permitted by the City. The crane on 13th st. will not be used during the weekend. Con Ed is on site working on the building but is not in any of the streets.
Additionally over the holiday weekend the site will be open on Saturday, September 1st but will be closed on Monday, the 3rd.