The Fourth Ave. Hotel

You may have noticed construction work speeding along at the corner of 13th St. and 4th Ave. This is to be an 11-story, 162-room hotel in the medium price range. It’s being built by Sam Chang, the king of New York hotel development. He’s famous for finding ways to squeeze hotels onto tiny lots. In this case he’s keeping the facade of the former building as a kind of pedestal. Unusually sensitive for a developer who is usually accused of having no architectural taste whatsoever.

Similar Posts

  • Latest New School Construction Update

    DOB has granted our request to start placing our concrete at 6am, which will allow us to finish this work earlier in the evening. We have 5 more instances like this until we finish our superstructure in early June.

    Therefore next week (April 23 to April 27), Superstructure work will continue at the 14th and 15th floor levels. Monday, April 23rd, and Thursday, April 26th, we will have a pour with a 6 am start time and similar end time, weather permitting. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.

    The following week (April 30 to May 4), we will continue superstructure concrete and slabs on the 15th and 16th floor levels. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.

    This weekend the site will be open on Saturday, April 21st for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork and concrete, plumbing and electrical work, rebar for concrete placement, using the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise.

    In addition to the normal work on the job site, we will have an additional crane on site at 13th st. and 5th ave. to install the stair trusses on the west side of the building. The crane will be completely on site and should not interfere with pedestrian or automotive traffic in the area.

  • Allbirds Shoes Coming

    Allbirds, the shoes that Silicon Valley loves, signed an 8,000-square-foot lease deal with The Bromley Companies at 120-122 Fifth Avenue in the Flatiron District. The clothing and shoe company will be moving into the two-floor space at the Bromley building after The Gap moved out in the summer of 2021 after nearly 30 years. The retail space on West 17th Street and Fifth Avenue will serve as Allbirds’ U.S. flagship store. The sudden vacancy left by The Gap marked the first time in four decades that the retail location had been empty, having been home to the first Barnes & Noble superstore in the nation prior to the clothing store coming to the Flatiron.

  • East Village Historic District?

    The Greenwich Village Society for Historic Preservation reports:

    At a meeting for affected property owners last night, the Landmarks Preservation Commission unveiled two small study areas for potential proposed historic districts in the East Village — one on Tompkins Square North and one centered along Second Avenue between Houston St. and St. Marks. This is a preliminary step in their consideration of these districts; the next step will be a public presentation and hearing before Community Board #3’s Landmarks Subcommittee on Thursday, May 12 at 6 pm at BRC, 30 Delancey Street, btw. Chrystie and Forsyth Streets.