  • Latest New School Construction Update

    Next week, 03/04/2013 – 03/08/2013 Material and equipment deliveries and installation work will continue on all floors inside the building. Roof work, work on the new sidewalks around the building, and the dismantling of the construction hoist on the building exterior will also continue.

    The following week, 03/11/2013 – 03/15/2013 Material and equipment deliveries and installation work will continue on all floors and roofs. Sidewalk work and dismantling of the construction hoist on the building exterior will also continue.

    We anticipate the take down of the 14th Street sidewalk shed to begin within the next 2 weeks.

  • Big Announcement About 113 East 13th

    From the NY Post:

    University Place is about to get a new, fun restaurant: the first New York outpost of Vapiano, a German-based chain of some 30 casual Italian eateries, which will open soon at 113 University at 13th Street. A Newmark Knight Frank team including Jeffrey Roseman repped the tenant and a Newmark team also repped the landlord, the Amalgamated Lithographers Union. Vapiano has locations in six other US cities. In Manhattan, it will have about 7,000 square feet on two levels in a long-vacant space. The asking rent was $200 per square foot. The chain, which calls itself a “fuel stop for grown-ups,” serves inexpensive antipasti, salads, pasta and pizza prepared on-site as customers watch. (Many dishes are priced under $10, according to Vapiano’s Web site). The new place also promises a full bar and “lively happy-hour scene.” Roseman chuckled, “It’s been described as a fast-casual cross between Mario Batali and Chipotle with uber-style.”

    Have a look at Vapiano.

  • Latest New School Construction Update

    Next week (November 19 to November 23), Material and equipment deliveries and installation work will continue on all floors. Curtain wall installation on the lower floors along 14th st. has been completed and the crane has left the job. The site will be closed on the 22nd for the holiday but will be open Friday the 23rd and Saturday the 24th.

    The following week (November 26 to November 30) Material and equipment deliveries and installation work will continue on all floors.

    This weekend the site will be open on Saturday, November 17th for interior related activities between the work hours of 7AM and 5PM as permitted by the City. Con Ed will be working in the street.