Popular Hot Pot Chain to Arrive on 13th St.

Shoo Loong Kan, a Chinese hot pot restaurant will soon arrive on 13th St. in the space that old timers will fondly remember as Borgo Antico. (The name means little dragon ridge.) The chain already has locations in Chicago, Houston, and Flushing.

 

Similar Posts

  • Economic Stats for Greenwich Village

    We may or may not technically live in Greenwich Village, but here are some fun stats anyway:
    Though it’s known as a hotbed of diversity, Greenwich Village is really quite homogeneous according to a new New York University-commissioned study by Appleseed, an economic analysis firm. Some highlights from The Economy of Greenwich Village: A Profile:

    ** The population of the Village last year was 72,025, virtually unchanged since 1990.
    ** Children under 18 comprise only 9.2 percent of the population, compared to almost 23 percent citywide. But between 2000 and 2009, the number of children under age 5 grew by 48 percent.
    ** Working age people (25-64 years) account for 69 percent of the Village population.
    ** Almost 80 percent of Village residents are white folks, 9.3 percent Asian, 6.2 percent Latino, 3 percent mixed race and 2.2 percent black.
    ** Village people have a median household income of just over $100,000 a year, more than double that of the rest of the city.
    ** 82.4 percent of Village residents have college degrees, beating even Cambridge (71.4 percent) and Palo Alto (78.7 percent).
    ** Ten percent of Village peeps work in the arts, recreation and hospitality industries compared to a whopping 18 percent in finance, insurance and real estate.
    ** Universities and colleges employ 10,350 people in the Village and their plans to expand are expected to stimulate growth in the local economy.

  • Korean War?

    Here on 13th St., ten-year-old Korean restaurant DoSirak has closed, while across the street in our building, BAK has opened. As it turns out, the BAK folks are the DoSirak folks, so all is well. Kimchi for all.

  • Latest New School Construction Update

    Next week (October 14th to October 18th), material and equipment deliveries and installation work will continue on the academic floors inside the building.

    The following week (October 21st to October 25th), material and equipment deliveries and installation work will continue on academic floors.

    This weekend the site will be open on Saturday, October 12th for interior activities between the work hours of 7AM and 5PM as permitted by the City.