The upscaling of 14th St. continues just three doors down, where Le Petit Belge has opened. Stop in for a Belgian waffle. $3.50 is a bit pricey for what’s essentially a zeppole, but they are pretty good, and who would have ever thought we’d have a takeout place on our block that features not one but six crystal chandeliers? New York magazine says: “When the waffles-to-go kiosk that Belgian expats Maor Livni and Greg Galel had planned for Logan Airport was nixed by a security-crazed fire marshal, the partners transplanted the business to Manhattan, where they’ve converted the former Tavalon tea shop into Le Petit Belge. A shrine of sorts to all things Belgian—or at least to Liège waffles, various imported chocolates, and paper cones full of mini-pancakes they call “poffys”—the shop takes a cannily ecumenical approach to New York snack food. That’s why it also serves frozen yogurt, provided by Berrywild, and rugalach made with Callebaut chocolate. And tea drinkers will still find the Tavalon line, in hot, frozen, and bubble varieties.”

Similar Posts

  • Latest New School Construction Update

    Next week (May 27 to May 31), material and equipment deliveries and installation work will continue on all floors inside the building. We will be working on the new sidewalks around the building and installing new curbs and will be removing the sidewalk shed along 13th st. Additionally we will be working on the roofs of the building. The site will be closed on Monday, the 27th for the holiday.

    The following week (June 3 to June 7), material and equipment deliveries and installation work will continue on all floors as well as sidewalk work.

    This weekend the site will be open on Saturday, May 25th for interior, roof, and sidewalk activities between the work hours of 7AM and 5PM as permitted by the City.

  • Latest New School Construction Update

    Next week, 03/18/2013 – 03/22/2013 mMaterial and equipment deliveries and installation work will continue on all floors inside the building. Roof work, work on the new sidewalks around the building, dismantling of the exterior construction hoist and related exterior building work will also continue. Take-down of the 14th Street sidewalk shed will begin this week and will be followed by continued site work on 14th Street.

    The following week, 03/25/2013 – 03/29/2013 material and equipment deliveries and installation work will continue on all floors and roofs. Sidewalk work and dismantling of the exterior construction hoist and related exterior work will also continue. Site work on 14th Street will continue.

    The site will be open this weekend for continued hoist removal related activities between the work hours of 7AM and 5PM as permitted by the City.