Watch Out for Water Shutoffs
You’ve surely noticed the water main repairs happening along 13th St. This will lead to water shutoffs at 830AM for up to five hours on Tuesday the 12th and Thursday the 14th, and perhaps other times.
Now baking at 64 University Place is Papa d’Amour, the new bakery from celebrated pastry master Dominique Ansel. It’s gonna be fancy. Here’s New York magazine’s take:
On a recent afternoon inside the kitchen that will open as Papa d’Amour later this month, the pastry chef Dominique Ansel was holding a spoonful of tomato-tinted scrambled eggs for the consideration of his wife, Amy Ma. “White pepper,” she said after trying it. “That’s not a bad thing.” She explained that Ansel will add vermicelli to the eggs to soak up any excess moisture so the mixture can then be stuffed inside a soft, steamed bao bun, which — because this is from the same chef who invented the Cronut all those years ago — will be folded in the shape of a croissant.
A single pastry that manages to reference a dim-sum staple, French patisserie, and the tomato-egg stir-fry that Ma’s mother cooked for her at home in Taiwan is but one of the many complex, globally collaged items on the menu of Papa d’Amour, which is Ansel’s “exploration” of Asian bread culture, as he puts it. More than that, it is a manifestation of love for his two children (the enfants to his papa) where customers will be able to find loaves of shokupan and sandwiches made on that Japanese milk bread (plain or laminated); pretzel-salt-crusted Chinese custard tarts; and a banana bread Malay cake derived not from the humble American home-baking staple but of Malaysia’s more elegant, fluffy, steamed sponge cake.
The Papa is particularly excited about a scallion-basil “blossom,” which, you’d never guess unless he told you, is his take on a Taiwanese scallion pancake. “I wanted something I can pull apart,” he says. He’d seen the way the pancake’s dough is fluffed by hand to give it a flaky, almost shredded surface and a chewy middle and wanted to come up with something that mimics that interplay. He was trained in France, so his mind went to two kinds of brioche: a regular version to encase the scallion component in the middle and a laminated, layered crown to encourage ripping.
Between 12th and 13th St. on University Place, the cleaners is moving, the European cookie store that no one needed is closing, and the Verizon store is gone. Is it a case of all leases running out at the same time? Who knows? What’s next? Who knows???
Signs announcing “#SaltBae coming soon” have been plastered on a space at 220 Park Avenue South, near Union Square, where a location of Japanese chain Haru Sushi once stood. Salt-sprinkling, internet sensation Nusret Gökçe first brought his famed Turkish steakhouse Nusr-Et to NYC in January, opening a 150-seat restaurant in Midtown.
But if Gökçe is indeed responsible for this signage, it could be slated for something other than a steakhouse. In February, he announced plans for a new burger chain, to be aptly named Salt Bae, telling the New York Post he’s plotting multiple locations in Manhattan and Brooklyn. The signage on the space says just “saltbae,” accompanied by an illustrated version of the butcher.
Critics fell harshly on Nusr-Et, finding the theatrical dinner served overpriced, mediocre steaks. Eater’s own Robert Sietsema described the beef as “a little rubbery” and “low on flavor,” although Pete Wells from the Times seems to have enjoyed his dining experience, going as far as calling the steak “terrific.”
The chain has over a dozen locations around the world, but only one other U.S. location exists in Miami, according to its website.
DOB has granted our request to start placing our concrete at 6am, which will allow us to finish this work earlier in the evening. We have 5 more instances like this until we finish our superstructure in early June.
Therefore next week (April 23 to April 27), Superstructure work will continue at the 14th and 15th floor levels. Monday, April 23rd, and Thursday, April 26th, we will have a pour with a 6 am start time and similar end time, weather permitting. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.
The following week (April 30 to May 4), we will continue superstructure concrete and slabs on the 15th and 16th floor levels. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.
This weekend the site will be open on Saturday, April 21st for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork and concrete, plumbing and electrical work, rebar for concrete placement, using the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise.
In addition to the normal work on the job site, we will have an additional crane on site at 13th st. and 5th ave. to install the stair trusses on the west side of the building. The crane will be completely on site and should not interfere with pedestrian or automotive traffic in the area.
The Greenwich Village Society for Historic Preservation reports:
At a meeting for affected property owners last night, the Landmarks Preservation Commission unveiled two small study areas for potential proposed historic districts in the East Village — one on Tompkins Square North and one centered along Second Avenue between Houston St. and St. Marks. This is a preliminary step in their consideration of these districts; the next step will be a public presentation and hearing before Community Board #3’s Landmarks Subcommittee on Thursday, May 12 at 6 pm at BRC, 30 Delancey Street, btw. Chrystie and Forsyth Streets.
Next week (October 7 to October 11), material and equipment deliveries and installation work will continue on the academic floors inside the building. Additionally we will be using a lift on the sidewalk to wash the exterior of the building.
The following week (October 14 to October 18), material and equipment deliveries and installation work will continue on academic floors.