Latest New School Construction Update

Next week (August 12 to August 16), material and equipment deliveries and installation work will continue on all floors inside the building. New School Students will be moving into the building starting August 15th and will continue gradually through the end of August.

The following week (August 19 to August 23), material and equipment deliveries and installation work will continue on all floors.

This weekend the site will be open on Saturday, August 10th for interior, and sidewalk activities between the work hours of 7AM and 5PM as permitted by the City.

Similar Posts

  • New School Construction Update

    The latest from the New School:

    Next week (January 17-21), Urban Foundations will continue to drill solder piles on 14th Street. The pile driving rig is scheduled to arrive on site, and will begin driving piles on 5th Ave, moving South. Loading out of debris and earth from the site will continue. Hand chopping of the existing foundation wall in the South East corner of 65 Fifth will also be taking place. Installation of the fence along the USC Courtyards will take place, followed by the removal of the existing protection.

    The following week (January 23 – 28), Urban is anticipated to continue driving piles along 5th Avenue, then continuing to 13th Street moving East. Excavation of earth and installation of timber lagging between piles on 14th street is planned to begin. Loading out of debris and earth from the site will continue. Demolition of existing foundation wall in SE corner of 65 Fifth by hand chopping will continue.

  • 14th St. Busway Is Coming in January

    With the forthcoming 15-month L train shutdown edging closer, the MTA and the city’s Department of Transportation have decided to convert Manhattan’s 14th Street into a busway three months ahead of the April 2019 shutdown.

    The two agencies will launch the M14 Select Bus Service on January 6, 2019, in hopes that riders will give it a test-run before the actual shutdown begins. “By implementing the M14 SBS months before we start the L train tunnel repairs, we hope that customers will take the opportunity to try our buses and see how the 14th Street busway can factor into their commutes once we start work fixing the L train tunnel,” said New York City Transit President Andy Byford.

    Between 5 a.m. and 10 p.m., 14th Street between Ninth and Third avenues eastbound and Third and Eighth Avenues westbound will be restricted to bus traffic only. The new SBS route will complement the current M14A and M14D buses and combined, the three routes will be able to handle roughly 84,000 passengers per day, notes amNY.

    The SBS route will start off with five stops between First and Tenth avenues that match up with subway transfer points and will run every two minutes during morning and evening rush hours. After its initial launch, the SBS route will be extended east to the planned Stuyvesant Cove ferry terminal on the East River to accommodate ferry customers from Brooklyn. This is expected to happen shortly before the beginning on the shutdown.

  • Union Square Partnership Gathers Resident Opinions

    How do you feel about Union Square. The Union Square Partnership does an annual opinion survey to find out. Some thoughts from the results:

    FOSTERING A THRIVING ECONOMY IN USQ
    USP asked respondents to share the types of businesses
    they would like to see in Union Square. Half of respondents
    would like to see more cultural institutions (50%),
    followed by art galleries/exhibitions (48%), and cafés/
    coffee shops (47%). Many respondents mentioned wanting
    to see more local businesses — including small, curated
    stores, non-chain coffee shops and eateries, and specialty
    grocery stores. This feedback highlights a strong community
    interest in maintaining a vibrant retail environment in
    Union Square rooted in unique, local offerings.

    ENHANCING LIVABILITY IN USQ
    USP is committed to keeping Union Square clean, safe, and
    beautiful. The majority of respondents are satisfied (very
    satisfied and somewhat satisfied) across key metrics of
    USP’s work enhancing livability. Respondents reported the
    highest levels of satisfaction with the landscaping of Union
    Square Park (87%), planter landscaping (87%), Broadway Plaza
    maintenance (85%), and public seating areas (77%). While
    most respondents remain pleased with the district’s upkeep,
    some expressed a desire for extended hours and seasonality
    for the public seating areas as well as improved lighting,
    especially in Union Square Park and surrounding streets.
    Following USP’s 2023 launch of the Public Safety Officer
    (PSO) program, perceptions of public safety improved by
    15 points in the 2024 survey. The 2025 survey results show
    that this perception has largely stabilized, with 87% of
    respondents noting that their perception of public safety
    in USP’s Core Services Area (CSA) has improved or seen
    no change over the past year. Moreover, the percent of
    respondents reporting concerns around public safety within
    the CSA decreased by 15% in 2025 compared to 2024.