Strand: Order Online, Pick Up at Store

The Strand has made it a lot easier to get what you need without having to dig for it in the store. Just order what you want online and pick it up at the store a couple of days later. You’ll save the shipping fee and all the time it takes to poke through the stacks. Of course, if you’re an inveterate browser, as many of us are, feel free to keep exploring. That’s what makes the Strand so much fun.

Similar Posts

  • A Bit More About 12 East 13th St.

    From the NY TIMES:

    As bikes abound and roads grow narrower, New York can seem to be turning its back on cars. The rapid disappearance of gas stations may not be helping things either.

    Parking garages are befalling similar fates, which may not be that surprising: Often humdrum, and built for function, they rarely seem to be the focus of preservation efforts, and developers have long eyed their sites for their potential.

    But in Greenwich Village, two garages are being incorporated into condo developments, at 12 East 13th Street, with eight units, and 17 East 12th Street, with nine.

    On East 13th, near Fifth Avenue, DHA Capital and Continental Properties are at work on a garage once used mainly by Hertz, the rental car company, which also had a ground-floor office. With eight floors, the garage was built in 1930, before modern zoning laws were imposed on the low-slung area, limiting height.

    Indeed, had the developers torn down the garage and built new, it is doubtful that a new structure could have been as bulky as what is there now, which meant converting was a better option, said Dan Hollander, DHA’s managing principal.

    Still, the developers could shift some things around; by shaving off the back of the building and adding that mass to the top, they were able to boost the height to 12 stories.

    Other alternations are needed. The windows were not big enough for residential use, so they are being enlarged, as the building also gains a new facade, Mr. Hollander said. But starting with a foundation and walls cut some construction costs on the $75 million project, he added; similarly, the condo will take less time to complete, about 16 months, versus 24 months for ground-up construction.

    DHA is also keeping a parking area, but for 11 cars, not 100 as before, and just on the second floor. Residents will drive into the original bay, then a robotic lift will pick up the vehicle and stow it.

    Starting at $7.5 million for a three-bedroom, the units went on sale in April, although no contracts had been signed by late June.

    An almost identical game plan is being followed on East 12th Street, where Rigby Asset Management is removing walls and floors from the back of the eight-story building to allow it to grow to 11 stories, giving apartments more light and air. There, too, a floor will be kept for parking, on the ground floor, for nine cars; and the same automated apparatus as at East 13th Street will serve as attendant. The nine condos, most of which have four bedrooms, are much pricier, however, starting at $14 million. Sales began at the end of June.

    “You get column-free space and tall ceilings,” said Peter Armstrong, Rigby’s managing partner, who previously converted a garage at 73 Wooster Street into a six-unit condo. “You feel like an artist with a blank canvas.”

     

  • Latest New School Construction Update

    Next week (December 12 to December 16), DOT approved street connections to underground utilities on Fifth Avenue have been completed. Superstructure work will continue at 1st and 2nd floor levels. Sidewalk sheds will continue being erected around the perimeter of the site. The roof protection at USC Condo courtyard will be started this week as well.

    The following week (December 19 to December 23), we will continue superstructure concrete and slabs on 1st and 2nd floor levels.

    This weekend the site will be open on Saturday, December 3rd for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork, plumbing and electrical work, rebar for concrete placement and use of the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise.

  • Latest New School Construction Update

    Next week (February 6 to February 10), Superstructure work will continue at and 4th and 5th floor levels. The following week (February 13 to February 17), we will continue superstructure concrete and slabs on 4th, 5th and 6th floor levels.

    This weekend the site will be open on Saturday, February 4th for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork and concrete, plumbing and electrical work, rebar for concrete placement, using the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise.

    14th Street Con ED vault utility connection street work will continue per DOT Permit granted for weekends only.

  • Italian Pastry on the Way

    Opening on May 21 at Broadway and 18th St., Minuto Bauli is the first U.S. outpost of the beloved Verona-based baking dynasty, Bauli. But this isn’t your average bakery. It’s a one-product wonderland dedicated entirely to a single, freshly baked, filled-to-order Italian treat: the Minuto Bauli.

    What is a Minuto Bauli, exactly? Think of it as the pastry equivalent of a mic drop. The dough, made with Bauli’s century-old Futura mother yeast, is crafted in Italy using high-quality ingredients like flour, eggs, butter and milk, then shipped to New York City, where it rises for 12 hours before being baked and dressed up right before your eyes. Guests can customize their treat with a selection of lush Italian creams, preserves, spreads and gourmet toppings.