New Thai to University and 11th

Similar Posts

  • Free HIV Testing in Union Square on June 27

    New Yorkers go to Union Square for various reasons. Whether it be to peruse the farmer’s market, doing a little shopping, or just to catch their next train, but on Thursday, June 27 you can also get a free HIV test. To mark National HIV Testing Day, the Community Healthcare Network (CHN) will provide all-day free HIV tests and Hepatitis C screenings, as well as meningitis vaccines.

    The HIV tests take 20 minutes for the results, so to make the wait more bearable there will be free massages, snacks, life-coaching, and stretching workshops while you wait. The CHN’s mobile van will be in the park from 9am-5pm, so stop by to find out your status, and get your meningitis vaccine before the weekend’s Pride festivities!

  • Latest New School Construction Update

    Next week, 03/11/2013 – 03/15/2013 Material and equipment deliveries and installation work will continue on all floors inside the building. Roof work, work on the new sidewalks around the building, dismantling of the exterior construction hoist and related exterior building work will also continue.

    The following week, 03/18/2013 – 03/22/2013 Material and equipment deliveries and installation work will continue on all floors and roofs. Sidewalk work and dismantling of the exterior construction hoist and related exterior work will also continue.

    We anticipate the take down of the 14th Street sidewalk shed to begin within the next 2 weeks.

  • Latest New School Update

    Next week (October 31 to November 4), Contractors will finish excavating and loading out material. Concrete foundation walls and slab on grade work will conclude as well as underground electrical and plumbing work. DOT approved street connections to underground utilities on Fifth Avenue will progress. Superstructure work will continue at cellar, 1st, and 2nd floor levels.

    The following week (November 7 to November 11), we will continue superstructure concrete and slabs. Street utility connection work will continue. A sidewalk shed will be erected around the perimeter of the site, subject to DOB approval, to protect pedestrians from superstructure work.

    This weekend the site will be open on Saturday, October 29 for foundation and superstructure related activities between the work hours of 9AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork, plumbing and electrical work, waterproofing and rebar for concrete placement and use of the crane and equipment to support all activities. We may pour a section of slab on grade concrete on Saturday. There will be no rock excavation or rock chopping.

  • Latest New School Construction Update

    Next week (October 21st to October 25th), material and equipment deliveries and installation work will continue on the academic floors inside the building and we anticipate paving on 5th Ave.

    The following week (October 28th to November 1st), material and equipment deliveries and installation work will continue on academic floors.

    This weekend the site will be open on Saturday, October 19th for interior activities between the work hours of 7AM and 5PM as permitted by the City.