Trees for Union Square Park
Trees are arriving and are being planted at the north end of the park. Click here for all the details.
What was briefly Rulin hand-pulled noodles on our 13th St. block has suddenly transformed into Taco Lane. Here is the write-up: “Taco Lane, the Asian taco bistro from the couple behind Brooklyn’s beloved Noodle Lane, is officially open in Union Square in the space that was formerly known as Rulin. Taco Lane is owned and operated by Li and her husband, Chris Wang, who have backgrounds in finance and technology, respectively. However, they made a significant shift in their careers to pursue food full-time. Li’s story is one of remarkable resilience spanning from her childhood in China and Flatbush to her becoming a chef. After completing her training at the Institute of Culinary Education while simultaneously working in finance, the birth of her son, Jackson, served as a catalyst for her decision to dedicate her life to the culinary arts. This pivotal moment ultimately led to the successful establishment of Noodle Lane at Smorgasburg in 2011. Subsequently, a brick-and-mortar location was opened in Park Slope in 2023, and now, the latest of the “Lane” locations has arrived in the form of Taco Lane.”
Strip House has doubled its size on East 12th St.
Adding them all up:
–Blue Bottle
–NewsBar
–Joe
–La Maison de Croque Monsieur
–Unnamed Japanese Bakery not yet open
–Blue Stripes Cacao Shop
–Baked by Melissa
–Le Café Coffee
–Nutella Café
–Grey Dog
–Pret a Manger
–Maison Keyser
The Greenwich Village Society for Historic Preservation has been doing some reconnaissance to find out what exactly developer Billy Macklowe has planned for his new condo building that will replace Village icon Bowlmor Lanes, and what they’ve found has not heartened them: “[The building] will take the form of a short base with retail uses coming out to the streetwall, and a very tall, narrow, residential tower rising above it. At approximately 308 feet in height, this will be one of the tallest, if not the tallest, buildings in the Village. Apparently Mr. Macklowe has told elected officials that the building will be limestone rather than glass or steel
Next week (May 28 to June 1), Superstructure work will continue at the 18th floor level. The superstructure concrete work will be completed on the building by the end of the month. We will begin pouring concrete at 6am on Friday the 25th in order to finish in a timely manner. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic. The site will be closed on Monday, May 28th for the Memorial Day Holiday.
The following week (June 4 to June 8), we will be working on the machine room levels on the 18th floor. Additionally we will have another crane on the Northwest corner of the site to help with a steel truss installation. This should not greatly affect pedestrian or road traffic. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.