Latest New School Construction Update

Next week (June 18 to June 22), Mechanical equipment and work will continue at the 17th and 18th floor levels. The superstructure concrete work will be completed on the building by the end of the month. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic. The crane on site is scheduled for demobilization on Saturday, the 25th.

The following week (June 25 to June 29), we will be working on the machine room levels on the 17th and 18th floors. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.

This weekend the site will be open on Saturday, June 16th for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to working on the mechanical systems of the building and using the crane and equipment to support activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise.

Similar Posts

  • Latest Construction Update: More of the Same

    “Next week (August 1 to August 5), Contractors will continue to excavate earth and rock, and load out material. Installation of bracing rakers, line drilling, lagging and sheeting around the perimeter will progress as well. Concrete foundation walls will continue along the perimeter of the site. Final adjustments to the access ramp within the site are ongoing. As early as Thursday, July 28th, the construction fence along the North end Fifth Avenue will be relocated to the curb line with pedestrians diverted to a walkway in the street as approved by the Department of Transportation. The following week (August 8 to August 12 ), we will continue with concrete foundation walls, line drilling, rock excavation, and loading out, as well as lagging and sheeting. DEP will continue to work on the water main along 13th Street. The site will be open on Saturday, July 30th. Work hours are between 9AM and 5PM as permitted by the City. To control noise levels, work activities will be limited to the placement of formwork and rebar for concrete placement, wood lagging, and installation of walers and braces. There will be no rock excavation, rock chopping, or hauling on Saturday.”

  • Latest New School Construction Update

    This is the 2 week look ahead for the New School’s University Center. Next week (August 5 to August 9), material and equipment deliveries and installation work will continue on all floors inside the building.

    The following week (August 12 to August 16), material and equipment deliveries and installation work will continue on all floors.

    This weekend the site will be open on Saturday, August 3rd for interior, and sidewalk activities between the work hours of 7AM and 5PM as permitted by the City. Additionally we will be paving along 13th st.

    Just a note to those who have made inquiry, the wall board panels are temporary and will be replaced when the final entrances are installed.