Latest New School Construction Update

This is the 2 week look ahead for the New School’s University Center. Next week (August 5 to August 9), material and equipment deliveries and installation work will continue on all floors inside the building.

The following week (August 12 to August 16), material and equipment deliveries and installation work will continue on all floors.

This weekend the site will be open on Saturday, August 3rd for interior, and sidewalk activities between the work hours of 7AM and 5PM as permitted by the City. Additionally we will be paving along 13th st.

Just a note to those who have made inquiry, the wall board panels are temporary and will be replaced when the final entrances are installed.

Similar Posts

  • Korean War?

    Here on 13th St., ten-year-old Korean restaurant DoSirak has closed, while across the street in our building, BAK has opened. As it turns out, the BAK folks are the DoSirak folks, so all is well. Kimchi for all.

  • The Latest Construction Update

    The New School says:

    Next week (August 29 to September 2), Contractors will continue to excavate earth and rock, and load out material. Installation of bracing rakers and line drilling will progress as well. Concrete foundation walls will continue along the perimeter of the site. Interior core foundation work and underground electrical and plumbing will proceed. Contractors will be removing the interior earth ramp. A small cherry picker crane will be delivered to the site next week and will be stationed inside the Construction fence. This crane will remain there for approximately two months.

    The following week (September 6 to September 9 ), we will continue with concrete foundation walls, line drilling, rock excavation, loading out, interior core foundation work, and underground electrical and plumbing. Concrete pours for the slab on grade are anticipated to start this week. The site will be closed for Labor Day weekend (Saturday, Sept. 3 through Monday, Sept. 5).

    DEP will continue to repair the water main along 13th Street. As part of this work, the DEP may periodically shut water service off. This work is out of our control.