Latest New School Construction Update

Next week (December 9th to December 13th ), material and equipment deliveries and installation work will continue on the academic floors inside the building.

The following week (December 16to to December 20th ), material and equipment deliveries and installation work will continue on academic floors

This weekend the site will be open on Saturday and Sunday, December 7th and 8th for interior activities between the work hours of 7AM and 7PM as permitted by the City.

Similar Posts

  • What’s Up with the Burned-Out Deli?

    Got $15 million? That’s what it will cost you to buy the burned out deli on the corner of 13th and 5th, which has stood vacant for the past two years. At that price, and given the zoning regulations, the most likely outcome would be a 10-story luxury condo building. But now doesn’t seem to be a good time for new condo development, so there are no takers. Even the New School, which as we all know is interested in increasing its presence in the area, has said that it is uninterested in the lot. Check out the fascinating history of the building.

  • New Plans for 65 5th Ave. to Be Revealed

    If you’re curious about the plans for the New School’s new construction on our block, there will be a public presentation on February 17. Here’s how the Greenwich Village Society for Historic Presentation is billing it:

    On Wednesday, February 17 at 6:30 pm The New School (TNS) will make a public presentation of its current plans for a new development at 65 Fifth Avenue, between 13th and 14th Streets. Having originally proposed a 300-350 ft. tall building rising straight up over the entire site which would have required several zoning variances, TNS is now proposing a much smaller, 16-story, 189 ft. tall (plus mechanicals) building which will set back above the 6th floor and which conforms to the existing zoning for the site. The presentation will be similar to that which was made to GVSHP, other community groups, and elected officials in December. The plans are not yet finalized at this time, but do contain significant details about TNS’ thinking and progress on the design.

    The fact that the mass and height of the proposed building has been reduced significantly from prior proposals in a very positive development. However, GVSHP does have concerns about the metal and glass design currently being contemplated for the facade of the building. The public presentation to Community Board #2’s Institutions Committee will be an opportunity to learn more about TNS’ plans for the site, ask questions, and provide feedback about the project.

    Attend the public presentation on Wednesday, February 17th at 6:30 pm at the St. Vincent’s Hospital cafeteria on 12th Street.

  • Latest New School Construction Update

    Next week (June 18 to June 22), Mechanical equipment and work will continue at the 17th and 18th floor levels. The superstructure concrete work will be completed on the building by the end of the month. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic. The crane on site is scheduled for demobilization on Saturday, the 25th.

    The following week (June 25 to June 29), we will be working on the machine room levels on the 17th and 18th floors. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.

    This weekend the site will be open on Saturday, June 16th for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to working on the mechanical systems of the building and using the crane and equipment to support activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise.