14th St. Coalition Alerts the Area to Huge Traffic Changes, Here’s How to Complain

Are you aware of the proposed MTA/DOT “L” train closure plans?

The MTA/DOT plans include a vehicular ban on 14th Street (between 3rd Ave & 9th Ave) for 16-21 hours a day:

 The ban will seriously impede the daily activities of thousands of 14th St. residents and businesses and will divert cars and trucks to residential side streets – with a 50% projected increase in traffic

The increase will be felt by the West Village, Village, East Village, Chelsea and the Flatiron Districts.

The proposed plans also includes a radical re-design of 13th Street with a two-way Bikeway:

MTA/DOT projects 2,000 – 5,000 cyclists DAILY on 13th Street 

The bikeway, coupled with a 50% increase in traffic, will seriously impede residential, educational, and emergency services on the street placing pedestrians and bicyclists at risk

The 14th Street Coalition is a growing group of residents and business that was formed in response to the MTA/DOT plans.

We ask the MTA/DOT to balance residential and transportation needs in a more equal way. They MUST consider the impact that will be felt on the quality of life concerns including air pollution, noise, congested streets and increased risks to pedestrians and bicyclists. 

We understand that the Canarsie Tunnel must be repaired.  We seek a temporary solution that is EQUALLY fair to residents, businesses and commuters. 

It’s Time to Take Action – Sign our petition (go to www.change.org and browse: 14th Street Coalition), join the 14th Street Coalition on Facebook for links to sample letters to send to our elected officials,

Email us at  14thstcoalition@gmail.com for more information.

 

Similar Posts

  • Reminder: Shareholders’ Meeting

    The annual shareholder’s meeting will take place on Wednesday June 30th at 7PM at the Seafarers’ and Interational House at 123 East 15th St, second floor.

    At the meeting, the Board of Directors will be seeking at least one new member. If you wish to become a candidate for the Board and have your name placed on the ballot, please feel free to provide a short biography of yourself via fax (212) 986-0002 or e-mail to ymartinez@akam.com. The Board will also welcome nominations at the meeting itself.

  • Yet Another Construction Update from the New School

    Next week (August 15 to August 19), contractors will continue to excavate earth and rock, and load out material. Installation of bracing rakers, line drilling, lagging and sheeting around the perimeter will progress as well. Concrete foundation walls will continue along the perimeter of the site. Interior core foundation work will proceed. The following week (August 22 to August 26 ), we will continue with concrete foundation walls, line drilling, rock excavation, loading out, and interior core foundation work & underground plumbing. DEP will continue to work on the water main along 13th Street. The site will be open on Saturday, August 13th. Work hours are between 9AM and 5PM as permitted by the City. To control noise levels, work activities will be limited to the placement of formwork and rebar for concrete placement, wood lagging, and installation of walers and braces. There will be no rock excavation, rock chopping, or hauling on Saturday.

  • Latest New School Construction Update

    Next week (April 8 to April 12), material and equipment deliveries and installation work will continue on all floors inside the building as well as roof work. We will be work on the new sidewalks around the building as well and plan on completing the 14th street side by the end of the week.

    The following week (April 15 to April 19), material and equipment deliveries and installation work will continue on all floors and roofs as well as sidewalk work. Additionally we plan to begin removing the sidewalk shed along 5th ave.

    This weekend the site will be open on Saturday, April 6th for interior, superstructure, sidewalk, and hoist removal related activities between the work hours of 7AM and 5PM as permitted by the City.

  • Latest New School Update

    Next week (October 31 to November 4), Contractors will finish excavating and loading out material. Concrete foundation walls and slab on grade work will conclude as well as underground electrical and plumbing work. DOT approved street connections to underground utilities on Fifth Avenue will progress. Superstructure work will continue at cellar, 1st, and 2nd floor levels.

    The following week (November 7 to November 11), we will continue superstructure concrete and slabs. Street utility connection work will continue. A sidewalk shed will be erected around the perimeter of the site, subject to DOB approval, to protect pedestrians from superstructure work.

    This weekend the site will be open on Saturday, October 29 for foundation and superstructure related activities between the work hours of 9AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork, plumbing and electrical work, waterproofing and rebar for concrete placement and use of the crane and equipment to support all activities. We may pour a section of slab on grade concrete on Saturday. There will be no rock excavation or rock chopping.