University and 13th: 1935

The northeast corner of University and 13th St., looking east, circa 1935. That’s the corner with the Basics hardware store. Fascinating!

Similar Posts

  • The Burned-Out Deli: Past, Present, Future

    The New York Times has a fascinating article about the deli across from the co-op on 13th St., reviewing its history as a Schraftt’s restaurant and talking about the importance of its now destroyed architectural details. But what’s really interesting is the revelation of the first details of what’s going to be built there: a ten-story building with one triplex, three duplexes, and ground floor retail. “As for the apartment house, which is being designed for an owner who bought the site this year, the architect says plans are still in flux but she will probably produce “a contemporary interpretation of the Fifth Avenue apartment houses in the neighborhood” — the same goal of harmony that Schrafft’s sought 70 years ago.”

  • Reminder: Shareholders’ Meeting

    The annual shareholder’s meeting will take place on Wednesday June 30th at 7PM at the Seafarers’ and Interational House at 123 East 15th St, second floor.

    At the meeting, the Board of Directors will be seeking at least one new member. If you wish to become a candidate for the Board and have your name placed on the ballot, please feel free to provide a short biography of yourself via fax (212) 986-0002 or e-mail to ymartinez@akam.com. The Board will also welcome nominations at the meeting itself.

  • Goodbye, Bowlmor

    By now we all know that the Bowlmor Lanes building on University Place is scheduled for demolition and will be replaced by condos. Goodbye, Stromboli Pizza, Japonica, and Vive La Crepe. Luckily, the newsstand is relocating across the street. Changes….

  • Latest New School Construction Update

    Next week (March 12 to March 16), Superstructure work will continue at 7th and 8th floor levels. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.

    The following week (March 19 to March 23), we will continue superstructure concrete and slabs on the 8th floor level. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic. We also have an approved After Hours Variance for Thursday and Friday in anticipation of a large concrete pour happening on one of those days.

    This weekend the site will be open on Saturday, March 10th for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork and concrete, plumbing and electrical work, rebar for concrete placement, using the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise.

    In addition, tomorrow, Friday the 9th, we will be starting operations at 6am in anticipation of a large concrete pour and will more than likely, with notification of the Department of Buildings, be going later into the evening to finish. Also on the weekend of the 10th the 14th St. Con Ed Vault utility connection street work will continue per DOT Permit granted for weekends only.