Latest New School Update
ByDonNext week (November 7 to November 11), DOT approved street connections to underground utilities on Fifth Avenue and 13th street will continue. Superstructure work will continue at cellar, 1st, and 2nd floor levels. A sidewalk shed will be erected around the perimeter of the site.
The following week (November 14 to November 18), we will continue superstructure concrete and slabs. Street utility connection work will continue. A street crane will be moved into position on 13th street to place structural steel in the building.
This weekend the site will be open on Saturday, November 5th for superstructure related activities between the work hours of 9AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork, plumbing and electrical work, and rebar for concrete placement and use of the crane and equipment to support all activities.
Shape Up for Free in the Park
ByDonEvery Thursday at 9AM from June 18 until August 13 you can join Brooklyn Bridge Boot Camp at the south end of Union Square for a free cardio workout. Feel the burn.
Latest New School Construction Update
ByDonNext week (June 10 to June 14), material and equipment deliveries and installation work will continue on all floors inside the building. We will be working on the new sidewalks around the building on 13th st. Additionally we will be working on the roofs of the building.
The following week (June 17 to June 21), material and equipment deliveries and installation work will continue on all floors as well as sidewalk work.
This weekend the site will be open on Saturday, June 8st for interior, roof, and sidewalk activities between the work hours of 7AM and 5PM as permitted by the City.
Italian Paradise Due at Madison Sq.
ByDonFrom the NY Times:
Eataly, a giant market for artisanal Italian food products that opened in Turin two years ago, signed a lease this morning for an even larger location at 200 Fifth Avenue. (23rd St.) With 32,000 square feet of food halls and restaurants, Eataly New York will be twice the size of the Turin original. The partners in the venture are B&B Hospitality Group, the company behind nearly 20 restaurants around the country operated by Joseph and Lidia Bastianich and Mario Batali, along with Oscar Farinetti and Luca Bassigo, the Italian founders and managing partners of Eataly. There will also be an 8,000 square foot rooftop garden, although the plans for that space are still being worked out. āIām not sure whether it will be for beer, sausage and pizza or just beer and sausage,ā Mr. Batali said in a phone interview today from a beach in Spain.Latest New School Construction Update
ByDonNext week (March 12 to March 16), Superstructure work will continue at 7th and 8th floor levels. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.
The following week (March 19 to March 23), we will continue superstructure concrete and slabs on the 8th floor level. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic. We also have an approved After Hours Variance for Thursday and Friday in anticipation of a large concrete pour happening on one of those days.
This weekend the site will be open on Saturday, March 10th for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork and concrete, plumbing and electrical work, rebar for concrete placement, using the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise.
In addition, tomorrow, Friday the 9th, we will be starting operations at 6am in anticipation of a large concrete pour and will more than likely, with notification of the Department of Buildings, be going later into the evening to finish. Also on the weekend of the 10th the 14th St. Con Ed Vault utility connection street work will continue per DOT Permit granted for weekends only.