  • Update on Union Square Construction

    Here’s an update on Union Square reconstruction:

    Work is progressing quickly to repave the 16th Street transverse. Crews are laying a new concrete base to better support the asphalt pavers for this heavily-trafficked portion of the park. Special care is being taken to preserve the root systems of the elm trees that bisect the pathway, and access to the center lawn for the disabled will be part of the final design. Repaving is expected to be completed by Labor Day.
    The center and east play areas are also moving along, with equipment installation nearly complete for both sections. The enormous Big Mountain play feature, fabricated by a silo manufacturer on Long Island, was welded together on site last week. The bulk of the remaining work will encompass retaining wall, decorative fence and bench installation, and final landscaping. In other construction news, Pavilion roof waterproofing, flashing and cornice work continues, as does new plaster work on the interior ceiling. Concrete and paver installation on the east plaza was recently finished, and excavation will soon begin on the east sidewalk south of the 16th Street transverse.

  • Latest New School Construction Update

    Next week (February 20 to February 24), Superstructure work will continue at 5th and 6th floor levels. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.

    The following week (February 27 to March 2), we will continue superstructure concrete and slabs on the 5th and 6th floor levels. Deliveries will continue to arrive at the site. The site will not be open on Monday the 20th, Presidents’ Day holiday.

    This weekend the site will be open on Saturday, February 18th for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork and concrete, plumbing and electrical work, rebar for concrete placement, using the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise.

  • Everyone Loves Sandwiches

    A tempting lineup of sandwiches awaits at the compact new Make Sandwich shop from Spencer Rubin, who owns the Melt Shop chain. He hired Josh Sharkey, the founder of Bark Hot Dogs, as culinary director. The nine preset sandwich combinations, like tri-tip steak with salsa verde, range in price from $7.95 to $11.95. All sandwiches are made to order in five to seven minutes with ingredients like Parmigiano-Reggiano, organic eggs and Pain d’Avignon bread. You can devise your own from a long list of choices for $10.95, with extra charges for some toppings: Make Sandwich, 135 Fourth Avenue (at 14th Street), 212-398-2602, makesandwich.com.

  • Latest New School Construction Update

    Next week (January 16 to January 20), Superstructure work will continue at and 3rd, 4th and 5th floor levels. Sidewalk shed along 14th Street has been opened and we will open the sidewalk shed along 5th ave completing the sidewalk shed work.
    The following week (January 23 to January 27), we will continue superstructure concrete and slabs on 3rd, 4th and 5th floor levels.
    This weekend the site will be open on Saturday, January 14th for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork and concrete, plumbing and electrical work, rebar for concrete placement, using the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise.

    In addition to the normal work this Saturday we will be installing a new crane on 5th Ave. that will service the site for the duration of the project. During the installation 13th St. will be closed as well as some lanes on 5th Ave.

  • Reminder: Shareholders’ Meeting

    The annual shareholder’s meeting will take place on Wednesday June 30th at 7PM at the Seafarers’ and Interational House at 123 East 15th St, second floor.

    At the meeting, the Board of Directors will be seeking at least one new member. If you wish to become a candidate for the Board and have your name placed on the ballot, please feel free to provide a short biography of yourself via fax (212) 986-0002 or e-mail to ymartinez@akam.com. The Board will also welcome nominations at the meeting itself.

  • Latest New School Construction Update

    Next week (November 25th to November 29th ), material and equipment deliveries and installation work will continue on the academic floors inside the building.

    The following week (December 2nd to December 6th), material and equipment deliveries and installation work will continue on academic floors

    This weekend the site will be open on Saturday and Sunday, November 23rd and 24th for interior activities between the work hours of 7AM and 5PM as permitted by the City.