WWD Evaluates Union Square
Women’s Wear Daily recently wrote about trends in real estate, shopping, and dining in the Union Square area.
Read all about it here.
Women’s Wear Daily recently wrote about trends in real estate, shopping, and dining in the Union Square area.
Read all about it here.
Go to http://www.walkscore.com and type in our address to see that we are ranked 100 out of 100 as a perfect walking neighborhood. You’ll see a Google map showing all the things that make our location a perfect urban location.
Next week (November 7 to November 11), DOT approved street connections to underground utilities on Fifth Avenue and 13th street will continue. Superstructure work will continue at cellar, 1st, and 2nd floor levels. A sidewalk shed will be erected around the perimeter of the site.
The following week (November 14 to November 18), we will continue superstructure concrete and slabs. Street utility connection work will continue. A street crane will be moved into position on 13th street to place structural steel in the building.
This weekend the site will be open on Saturday, November 5th for superstructure related activities between the work hours of 9AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork, plumbing and electrical work, and rebar for concrete placement and use of the crane and equipment to support all activities.
Don’t be fooled by its name. The new $850-per-night boutique hotel The Twenty Two is actually located at 16 East 16th St. It will also feature a restaurant and a members-only club. Another upscale addition to the area.
Next week (July 22 to July 26), material and equipment deliveries and installation work will continue on all floors inside the building. Asphalt work on 14th st will begin this week to tie in the finished sidewalk. We will be opening the new sidewalk on 13th st. Additionally we will be working on the roofs of the building. Furniture deliveries will take place in the afternoon along 5th ave.
The following week (July 29 to August 2), material, equipment and furniture deliveries and installation work will continue on all floors as well as sidewalk work.
This weekend the site will be open on Saturday, July 20th for interior, roof, and sidewalk activities between the work hours of 7AM and 5PM as permitted by the City.