Archives: Union Square 19th Century

From Bedford + Bowery:
A Union Square institution, Coffee Shop, served its final brunch Sunday with one last samba performance by Maucha Adnet, her trio, and a pair of roving carnival dancers. Charles Milite and Eric Petterson– who own the restaurant with Karolyn Effer, wife of music producer Jellybean Benitez— were on hand for the farewell, and fondly remembered a New York magazine story about the Brazilian diner’s opening 28 years ago. It noted “the late-nighters who’ve been thronging Coffee Shop and its secret room in the back–artists, actors and young models wearing black tights and gold medallions.” At the time, Patterson said he wanted the 23-hour diner to recreate the feeling of Brazil: “the sensuality, the music, the friendliness of the people.”
Since then, Coffee Shop has held on, despite never really being a foodie destination; its basement, once an after-hours party spot for ’90s cool kids, recently served as a chill-out zone for off-duty models during Fashion Week. And its outdoor tables were a dependable spot for leisurely people-watching. But back in July, it was announced that the restaurant would close. “The times have changed in our industry,” Milite, himself a former model, told the New York Post. “The rents are very high and now the minimum wage is going up and we have a huge number of employees.”
Next week (October 22 to October 26), Material and equipment deliveries and installation work will continue on all floors. Curtain wall installation on upper floors will continue. Curtain wall installation on the lower floors will proceed along 14th st. inside the construction site. The crane that is on site will remain for the duration of curtain wall installation and will not affect pedestrian or automotive traffic.
The following week (October 29 to November 2) Material and equipment deliveries and installation work will continue on all floors. Curtain wall installation will continue on all floors. Curtain wall installation on the lower floors will proceed along 14th st. inside the construction site.
This weekend the site will be open on Saturday, October 20th for superstructure related activities and curtain wall installation between the work hours of 7AM and 5PM as permitted by the City. Con Ed will be working in the street.