12-Story Condo to Come to Union Square East

Permits have been filed to build a 12-story 29-unit building at 34 Union Square East. The proposed 124-foot-tall building will have 29,390 square feet of residential space and 1,555 square feet of commercial space. The site formerly held a TGIF restaurant and then the Spacious co-working space. It has been vacant for six years.

Similar Posts

  • Latest New School Construction Update

    Next week (January 21 to January 25), material and equipment deliveries and installation work will continue on all floors inside the building as well as roof work. Additionally we will begin work on the new sidewalks around the building. The site will be closed for the holiday on Monday, the 21st.

    The following week (January 28 to February 1), Material and equipment deliveries and installation work will continue on all floors and roofs as well as sidewalk work.

    This weekend the site will be open on Saturday, January 19th for interior and superstructure related activities between the work hours of 7AM and 5PM as permitted by the City.

  • New Food Hall Just Two Blocks Away

    Urbanspace has opened a 10,000-square-foot food hall in Manhattan. Urbanspace Union Square is located on the ground floor of Zero Irving, a new mixed-use building on East 14th St. at the foot of Irving Place between 3rd adn 4th Avenues. Vendors include Summer Salt, Twenty One Grains, Kid Brother Pizza, Pita Yeero, Plant Junkie, Goat Café, Bao by Kaya, Bobwhite Counter, Playa Bowls, Wafels & Dinges, Top Hops, Casa Toscana and GoFish. The venue marks the fifth New York City food hall by Urbanspace.

  • Update on the North End of the Park

    Here’s the official word on how the renovations are going:

    Spring weather has brought with it a flurry of activity in Union Square Park, both in the new playground and at the construction site.  Parents and kids have been taking full advantage of the warm sunny days by swinging, climbing and sliding their way out of the winter doldrums.  The Partnership’s new landscape efforts, including more than 260 ornamental shrubs and 650 perennials, will soon be underway, as well as the creation of additional seating opportunities in the center lawn, in front of the new Pavilion entrance and around the James Fountain (a/k/a Mother & Child).

    In construction news, structural work on the Pavilion columns and ceiling beams has finished at last, and the protective plywood barriers have been removed from the front of the building, exposing the beautifully restored neo-classical interior to passersby.  As the Pavilion elevator is installed and tested, interior lighting fixtures, gates and handrails round out the final touches of building restoration work.

    Park visitors can soon make use of the restroom facilities as they, too, near completion.  Last week, eco-resin panels were mounted above the granite walls to enclose the building, allowing the final plumbing fixtures to be installed.  Once complete, the Parks Department will work closely with the Department of Buildings to inspect all systems in order to open the facilities for the busy summer season.

  • Latest New School Construction Update

    Next week (August 20 to August 24), Material and equipment deliveries and installation work will continue on all floors. Curtain wall installation on upper floors will continue and lower levels will continue on 13th st. with the aid of a small crane. The crane will remain on 13th st. for the purpose of curtain wall installation.

    The following week (August 27 to August 31) Material and equipment deliveries and installation work will continue on all floors. Curtain wall installation will continue on all floors. Work on 13th st should be complete by the end of this week and will be moved to 5th ave. to continue wrapping the building.

    This weekend the site will be open on Saturday, August 25th for superstructure related activities and curtain wall installation between the work hours of 7AM and 5PM as permitted by the City. The crane on 13th st. will not be used during the weekend. Con Ed is on site working on the building but is not in any of the streets.

    Additionally over the holiday weekend the site will be open on Saturday, September 1st but will be closed on Monday, the 3rd.