What’s New on Wash. Square South?
Here’s an update on what NYU plans to build on the now vacant lot on Washington Square Park South where the Catholic Church used to be.
At least it’s only six stories high.
After nearly two and a half years since Dryden Gallery moved out, 129 Fourth Ave. is getting a new full-time tenant.
The Post reports that the first U.S. outpost of Mi Garba (“I like it” in Italian!) is opening here just south of East 13th Street.
And what will they sell?
“The flagship 1,000 square-foot space, at 129 Fourth Ave., will include a restaurant with 10 tables. There will also be Tuscan food and wine for sale along with a boutique offering fashion items, including custom-made shirts and jackets.”
So we’re swapping one big box electronics store for another. Best Buy will move into the old Circuit City space on 14th St. by the end of the year.
The upscaling of 14th St. continues just three doors down, where Le Petit Belge has opened. Stop in for a Belgian waffle. $3.50 is a bit pricey for what’s essentially a zeppole, but they are pretty good, and who would have ever thought we’d have a takeout place on our block that features not one but six crystal chandeliers? New York magazine says: “When the waffles-to-go kiosk that Belgian expats Maor Livni and Greg Galel had planned for Logan Airport was nixed by a security-crazed fire marshal, the partners transplanted the business to Manhattan, where they’ve converted the former Tavalon tea shop into Le Petit Belge. A shrine of sorts to all things Belgian—or at least to Liège waffles, various imported chocolates, and paper cones full of mini-pancakes they call “poffys”—the shop takes a cannily ecumenical approach to New York snack food. That’s why it also serves frozen yogurt, provided by Berrywild, and rugalach made with Callebaut chocolate. And tea drinkers will still find the Tavalon line, in hot, frozen, and bubble varieties.”
Here’s a wonderful historical photo tour of 14th St. from end to end.
Next week (March 19 to March 23), Superstructure work will continue at the 8th floor level. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.
The following week (March 26 to March 30), we will continue superstructure concrete and slabs on the 8th and 9th floor levels. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.
This weekend the site will be open on Saturday, March 17th for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork and concrete, plumbing and electrical work, rebar for concrete placement, using the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise.
In addition, tomorrow, Friday the 16th, we will be starting operations at 6am in anticipation of a large concrete pour and will more than likely, with notification of the Department of Buildings, be going later into the evening to finish. Also on the weekend of the 10th the 14th St. Con Ed Vault utility connection street work will continue per DOT Permit granted for weekends only.
“Next week (August 1 to August 5), Contractors will continue to excavate earth and rock, and load out material. Installation of bracing rakers, line drilling, lagging and sheeting around the perimeter will progress as well. Concrete foundation walls will continue along the perimeter of the site. Final adjustments to the access ramp within the site are ongoing. As early as Thursday, July 28th, the construction fence along the North end Fifth Avenue will be relocated to the curb line with pedestrians diverted to a walkway in the street as approved by the Department of Transportation. The following week (August 8 to August 12 ), we will continue with concrete foundation walls, line drilling, rock excavation, and loading out, as well as lagging and sheeting. DEP will continue to work on the water main along 13th Street. The site will be open on Saturday, July 30th. Work hours are between 9AM and 5PM as permitted by the City. To control noise levels, work activities will be limited to the placement of formwork and rebar for concrete placement, wood lagging, and installation of walers and braces. There will be no rock excavation, rock chopping, or hauling on Saturday.”