Eataly, a giant market for artisanal Italian food products that opened in Turin two years ago, signed a lease this morning for an even larger location at 200 Fifth Avenue. (23rd St.) With 32,000 square feet of food halls and restaurants, Eataly New York will be twice the size of the Turin original. The partners in the venture are B&B Hospitality Group, the company behind nearly 20 restaurants around the country operated by Joseph and Lidia Bastianich and Mario Batali, along with Oscar Farinetti and Luca Bassigo, the Italian founders and managing partners of Eataly. There will also be an 8,000 square foot rooftop garden, although the plans for that space are still being worked out. ā€œI’m not sure whether it will be for beer, sausage and pizza or just beer and sausage,ā€ Mr. Batali said in a phone interview today from a beach in Spain.

Similar Posts

  • Latest New School Construction Update

    DOB has granted our request to start placing our concrete at 6am, which will allow us to finish this work earlier in the evening. We have 3 more instances like this until we finish our superstructure in early June. Friday, May 4 we will have a pour at the 16th floor with a 6am start time and similar end dime, weather permitting.

    Therefore, next week (May 7 to May 11), Superstructure work will continue at the 17th floor level. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.

    The following week (May 14 to May 18), we will continue superstructure concrete and slabs on the 17th floor and roof levels. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.

    This weekend the site will be open on Saturday, May 5th for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork and concrete, plumbing and electrical work, rebar for concrete placement, using the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise. In addition to the normal work on the job site, we will have an additional crane on site at 5th ave. to install the stair trusses on the west side of the building. The crane will be completely on site and should not interfere with pedestrian or automotive traffic in the area.

  • New School Construction: More of the Same

    This week (June 6-10), contractors will continue to excavate earth and rock, and load out material. We will complete the underpinning of the adjacent buildings. Installation of rakers, line drilling, lagging and sheeting around the perimeter will progress as well. Concrete foundation walls are scheduled to begin.

    The following week, we will continue line drilling, rock excavation, and loading out, as well as lagging and sheeting.

    Concrete foundation walls will progress.