Frozen Yogurt Faceoff
Pinkberry and Red Mango are going at it just one block west. The Villager has all the details.
Note that September 24 is the date this year for the annual Harvest in the Square celebration. Tickets are $115. Go here for details.
This is the 2 week look ahead for the New School’s University Center. Next week (August 5 to August 9), material and equipment deliveries and installation work will continue on all floors inside the building.
The following week (August 12 to August 16), material and equipment deliveries and installation work will continue on all floors.
This weekend the site will be open on Saturday, August 3rd for interior, and sidewalk activities between the work hours of 7AM and 5PM as permitted by the City. Additionally we will be paving along 13th st.
Just a note to those who have made inquiry, the wall board panels are temporary and will be replaced when the final entrances are installed.
Don’t be fooled by its name. The new $850-per-night boutique hotel The Twenty Two is actually located at 16 East 16th St. It will also feature a restaurant and a members-only club. Another upscale addition to the area.
The McDonald’s on 6th Ave between 14th and 15th St. has been remodeled in a sleek and sexy European style. Well worth a visit to see what the future of fast food looks like.
A huge change of course for the proposed L train shutdown. Even though traffic on the northernmost block of University Place has been reversed, and even though the 13th St. bike lane is in full effect–and constantly blocked by trucks, of course–it now appears that none of this may have been necessary, and the upcoming 14th St. busway may not be implemented at all. Very very confusing. The MTA is ridiculous.