Thanks to Charles Stimson for purchasing and sharing these four photographs from the city archives. Shot for a tax survey in 1939, they show our block and are full of fascinating detail if you click on them to blow them up and look a little closer. Wouldn’t you love to stop off at Marty’s Luncheon for a sandwich? As New York races into the future, it’s quite a thrill to be able to look back and remind ourselves how things used to be.
Here is a tour of several landmark cast-iron buildings in the neighborhood, including two on our block.
Next week (May 27 to May 31), material and equipment deliveries and installation work will continue on all floors inside the building. We will be working on the new sidewalks around the building and installing new curbs and will be removing the sidewalk shed along 13th st. Additionally we will be working on the roofs of the building. The site will be closed on Monday, the 27th for the holiday.
The following week (June 3 to June 7), material and equipment deliveries and installation work will continue on all floors as well as sidewalk work.
This weekend the site will be open on Saturday, May 25th for interior, roof, and sidewalk activities between the work hours of 7AM and 5PM as permitted by the City.
File under news of the weird.
Next week (August 20 to August 24), Material and equipment deliveries and installation work will continue on all floors. Curtain wall installation on upper floors will continue and lower levels will continue on 13th st. with the aid of a small crane. The crane will remain on 13th st. for the purpose of curtain wall installation.
The following week (August 27 to August 31) Material and equipment deliveries and installation work will continue on all floors. Curtain wall installation will continue on all floors. Work on 13th st should be complete by the end of this week and will be moved to 5th ave. to continue wrapping the building.
This weekend the site will be open on Saturday, August 25th for superstructure related activities and curtain wall installation between the work hours of 7AM and 5PM as permitted by the City. The crane on 13th st. will not be used during the weekend. Con Ed is on site working on the building but is not in any of the streets.
Additionally over the holiday weekend the site will be open on Saturday, September 1st but will be closed on Monday, the 3rd.