This week (May 16 to May 20), Contractors will continue to excavate earth and rock, and load out material. We will continue to underpin the 13th Street adjacent building. Drilling of tie-backs, installation of rakers, line drilling, lagging and sheeting around the perimeter will progress as well. Preparation for concrete foundation walls is scheduled to begin.
The following week (May 23 to May 27), we will continue line drilling, rock excavation, and loading out as well as, lagging and sheeting. Concrete foundation walls will progress.
Osso Buco on University is closed for renovations. Rumor has it that it will return in a more “contemporary” form. We’ll see.
The annual meeting of shareholders will take place on June 6 at 7PM at the Seafarers and International House at 123 East 15th St., second floor.
Next week (February 18 to February 22), material and equipment deliveries and installation work will continue on all floors inside the building as well as roof work. Additionally we will begin work on the new sidewalks around the building. The sidewalk shed on 14th st. is scheduled to begin dismantling, pending construction progress. The site will be closed on Monday, February 18th, for the holiday.
The following week (February 25 to March 1), Material and equipment deliveries and installation work will continue on all floors and roofs as well as sidewalk work.