Latest New School Construction Update

Next week (February 6 to February 10), Superstructure work will continue at and 4th and 5th floor levels. The following week (February 13 to February 17), we will continue superstructure concrete and slabs on 4th, 5th and 6th floor levels.

This weekend the site will be open on Saturday, February 4th for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork and concrete, plumbing and electrical work, rebar for concrete placement, using the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise.

14th Street Con ED vault utility connection street work will continue per DOT Permit granted for weekends only.

Similar Posts

  • Latest New School Construction Update

    Next week (June 10 to June 14), material and equipment deliveries and installation work will continue on all floors inside the building. We will be working on the new sidewalks around the building on 13th st. Additionally we will be working on the roofs of the building.

    The following week (June 17 to June 21), material and equipment deliveries and installation work will continue on all floors as well as sidewalk work.

    This weekend the site will be open on Saturday, June 8st for interior, roof, and sidewalk activities between the work hours of 7AM and 5PM as permitted by the City.

  • Union Square BID Reports Recent Pandemic-Related Business and Transit Statistics

    According to transit data from MTA and Citi Bike, Union Square continues to be one of the City’s top destinations for employees, residents and visitors alike. While subway ridership remains low across the system, currently 20% of normal use, turnstile activity at the Union Square-14th Street station has tripled since April.

    Similarly, bus ridership on the M14A/D busway is gaining momentum as average daily bus ridership has tripled since its low point in late March, reaching nearly 60% of pre-COVID daily ridership levels. For those visiting the district by Citi Bike, Broadway and 17th Street remains one of the City’s top 10 destination stations and ridership is up 45% since April. Another popular end station, Broadway and East 14th Street has experienced a 57% increase in use since April.

    Other indicators are up too. Union Square’s public Wi-Fi use is up to 42% from 15% at the start of the pandemic, signaling an uptick in outdoor activity. The district’s active public realm can be attributed to the draw of the Greenmarket, the expansion of outdoor dining activating sidewalks and roadways, and the reopening of local business that attracts steady foot traffic across the district.

    Union Square’s zip codes (10003, 10010 and 10011) make up 16% of Open Restaurants applications in Manhattan with the City’s highest number of applications located in 10003! Within Union Square-14th Street, nearly two thirds of businesses are conducting storefront activity and this number continues to grow as additional businesses and cultural institutions are making exciting plans to open their doors with events and programming as soon as it is safe to do so.