Latest New School Construction Update

Next week (March 19 to March 23), Superstructure work will continue at the 8th floor level. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.

The following week (March 26 to March 30), we will continue superstructure concrete and slabs on the 8th and 9th floor levels. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.

This weekend the site will be open on Saturday, March 17th for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork and concrete, plumbing and electrical work, rebar for concrete placement, using the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise.

In addition, tomorrow, Friday the 16th, we will be starting operations at 6am in anticipation of a large concrete pour and will more than likely, with notification of the Department of Buildings, be going later into the evening to finish. Also on the weekend of the 10th the 14th St. Con Ed Vault utility connection street work will continue per DOT Permit granted for weekends only.

Similar Posts

  • Hyatt Union Square Will Add Urban Farm

    The nonprofit behind the Union Square Greenmarket plans to open a new community space in the neighborhood to host events and classes on sustainability and nutrition, and provide a spot for other nonprofits in the city to gather near Union Square, according to GrowNYC Assistant Director Julie Walsh. The space, called “Project Farmhouse,” is expected to open at 76 E. 13th St., near Fourth Avenue, by November with a test kitchen, a conference room and a vertical grow wall with moving trays designed to rotate plants so they all get the ideal amount of water, fertilizer and light, said Kate Chura of GrowNYC, who is overseeing the project.

  • The Build a Block meeting for Sector Boy will be held on Tuesday, March 18th, at 6:30 PM. This meeting will focus on crime trends, quality of life issues, and any other questions or concerns you may have.

    Please feel free to invite any neighbors or friends who may be interested in attending. If there are specific topics you would like to discuss in more depth, please reach out to PO Alvin Farciert in advance via phone, text, or email so that they can be properly addressed.

    See the image here for further details, including PO Farciert’s contact information below.

    PO Alvin Farciert

    Neighborhood Coordination Officer | Sector Boy

    NYPD 6th Precinct

    233 West 10 Street, New York, NY 10014

    (212) 741-4811 | Precinct

    (917) 593 9567 || Cell

    Alvin.Farciert@nypd.org | E-mail

  • No Danny Meyer in Park

    There was a rumor that leading restauranteur Danny Meyer wanted to run the new restaurant to be established in the Union Square Park pavilion. Not true, says Meyer, but he will be taking over the cursed Wakiya space in the Gramercy Park Hotel and establishing an Italian restaurant there.