Mysterious Clock Now Counts Down to Our Doom

In honor of Climate Week, a coalition of scientists and activists reset the digital clock with red numbers seen on the side of a building in Union Square and changed it into a “ClimateClock.” The numbers now count down the years, days, hours, minutes and seconds the Earth has left to take action to stop global warming from going over 1.5°C more than the pre-industrial levels.

According to the organization, who aims to put the countdown clock in cities across the world, the clock’s calculation is based on the world’s current rates of emissions and the amount of CO2 that can still be released into the atmosphere. The clock simply counts down to when the “carbon budget” runs out. If the world manages to lower its emissions, more time will be left on the clock.

The clock is based on the carbon clock made by the Mercator Research Institute on Global Commons and Climate Change (MCC) which uses data from the recent IPCC Special Report on Global Warming of 1.5°C, ClimateClock says.

The artists responsible for putting up the clock in Manhattan told the New York Times in an interview that the display will be up until the end of Climate Week, Sept. 27. Artists Gan Golan and Andrew Boyd also told the paper that they created a mobile Climate Clock for Swedish climate activist Greta Thunberg last year before her appearance at the UN Climate Action Summit.

With the backdrop of recent wildfires and hurricanes, which scientists say show how climate change is magnifying the extremes in weather, protests for climate action are expected all over the world on Friday.

Similar Posts

  • Latest New School Construction Update

    Next week (January 9 to January 13), Superstructure work will continue at and 2nd , 3rd and 4th floor levels. The sidewalk shed along 14th Street has been opened and we will begin working on the side walk shed along 5th ave.

    The following week (January 16 to January 20), we will continue superstructure concrete and slabs on 2nd , 3rd and 4th floor levels. The weekend of Saturday 1/14/12 we will be installing a new crane that will service the site for the duration of the job.

    This weekend the site will be open on Saturday, January 7th, for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork and concrete, plumbing and electrical work, rebar for concrete placement, using the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise.

  • 14th St. Busway Is Finally On Again…Again

    This time it’s for real. Maybe. On Thursday, the 14th St. Busway will go live, bringing with it an unknown amount of change and perhaps chaos the neighborhood. Once it’s in effect, the Busway will mean that the only way to get crosstown westbound without interruption will be on 13th St. since neither 11th St. nor 15th St. cut across town uninterrupted. Will 13th St. become a nightmare? We shall soon see.