Next week (November 7 to November 11), DOT approved street connections to underground utilities on Fifth Avenue and 13th street will continue. Superstructure work will continue at cellar, 1st, and 2nd floor levels. A sidewalk shed will be erected around the perimeter of the site.
The following week (November 14 to November 18), we will continue superstructure concrete and slabs. Street utility connection work will continue. A street crane will be moved into position on 13th street to place structural steel in the building.
This weekend the site will be open on Saturday, November 5th for superstructure related activities between the work hours of 9AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork, plumbing and electrical work, and rebar for concrete placement and use of the crane and equipment to support all activities.
Steak Frites on 16th St., which morphed into Union Prime, is morphing back into Steak Frites. Go figure
Next week (May 14 to May 18), Superstructure work will continue at the 18th floor level. The superstructure concrete work will be completed on the building buy the end of the month. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.
The following week (May 21 to May 25), we will be working on the machine room levels on the 18th floor. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.
This weekend the site will be open on Saturday, May 12th for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork and concrete, plumbing and electrical work, rebar for concrete placement, using the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise. There will be steel work being done on the 5th Ave. side of the building. As a result there will be another crane on site to lift the pieces into place but it will sit in the site and will not affect pedestrian or motor traffic in the area.
Additionally, Con Ed will be doing street connections on 14th street.
Next week (October 14th to October 18th), material and equipment deliveries and installation work will continue on the academic floors inside the building.
The following week (October 21st to October 25th), material and equipment deliveries and installation work will continue on academic floors.
This weekend the site will be open on Saturday, October 12th for interior activities between the work hours of 7AM and 5PM as permitted by the City.
With rooms starting at $529 (rack rate), you probably can’t afford to stay at the new Hyatt Union Square when it opens, but perhaps you can check out one of its restaurants or bars:
THE FOURTH: The Fourth, an all-day American Brasserie serving breakfast, lunch, dinner and weekend brunch provides straightforward high-quality items with surprising accents. A chic European style espresso bar, located at its entrance, will offer a comfortable casual place to enjoy our signature coffee – Café Quatrième – pastries and nibbles. Soaring ceilings and wide open-air French doors allow streams of light to fill the room.
SINGL LOUNGE: A full service bar and lounge featuring an extensive single malt scotch selection and single vineyard wine by the glass selection. An exciting place to gather during the day and evening.
KITCHEN AND WINE GALLERY: A vibrant venue for your next gathering. This versatile space features an open kitchen and hearth connecting you and your guests to our team of chefs. This venue features a New York approach to South American Dining combining progressive Latin sounds with warm succulent scents. Glowing wine displays and decanting stations will enhance the beverage aspect of your experience. Cutting edge art throughout the space reflects the art scene of Greenwich Village and Union Square.
Next week (January 16 to January 20), Superstructure work will continue at and 3rd, 4th and 5th floor levels. Sidewalk shed along 14th Street has been opened and we will open the sidewalk shed along 5th ave completing the sidewalk shed work.
The following week (January 23 to January 27), we will continue superstructure concrete and slabs on 3rd, 4th and 5th floor levels.
This weekend the site will be open on Saturday, January 14th for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork and concrete, plumbing and electrical work, rebar for concrete placement, using the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise.
In addition to the normal work this Saturday we will be installing a new crane on 5th Ave. that will service the site for the duration of the project. During the installation 13th St. will be closed as well as some lanes on 5th Ave.