From DNAinfo:
A developer’s plans to knock down two buildings in an historic district near Union Square to make room for new apartment towers, was shot down by the local community board, who say the integrity of the neighborhood and the retail options there should be preserved. Developer C.A. White wants to tear down two buildings at 21 W. 17th St. and 16 W. 18th St. to build 13- and 11-story apartment buildings in their place. The current buildings, which are significantly shorter, are occupied by a Rent a Runway shop and an empty storefront, formerly home to the restaurant BLT. They’re also a part of the Ladies Mile Historic District, and would ultimately need approval from the Landmark Preservation Commission to be altered.
The New York Times has a fascinating article about the deli across from the co-op on 13th St., reviewing its history as a Schraftt’s restaurant and talking about the importance of its now destroyed architectural details. But what’s really interesting is the revelation of the first details of what’s going to be built there: a ten-story building with one triplex, three duplexes, and ground floor retail. “As for the apartment house, which is being designed for an owner who bought the site this year, the architect says plans are still in flux but she will probably produce “a contemporary interpretation of the Fifth Avenue apartment houses in the neighborhood” — the same goal of harmony that Schrafft’s sought 70 years ago.”
Next week (March 19 to March 23), Superstructure work will continue at the 8th floor level. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.
The following week (March 26 to March 30), we will continue superstructure concrete and slabs on the 8th and 9th floor levels. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.
This weekend the site will be open on Saturday, March 17th for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork and concrete, plumbing and electrical work, rebar for concrete placement, using the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise.
In addition, tomorrow, Friday the 16th, we will be starting operations at 6am in anticipation of a large concrete pour and will more than likely, with notification of the Department of Buildings, be going later into the evening to finish. Also on the weekend of the 10th the 14th St. Con Ed Vault utility connection street work will continue per DOT Permit granted for weekends only.
This weekend the site will be open on Saturday, July 28st for superstructure related activities and curtain wall installation between the work hours of 7AM and 5PM as permitted by the City. The crane on 13th st. will not be used during the weekend.
Next week (July 30 to August 3), Material and equipment deliveries and installation work will continue on all floors. Curtain wall installation on upper floors will continue and lower levels will continue on 13th st. with the aid of a small crane. The crane will remain on 13th st. for the purpose of curtain wall installation.
The following week (August 6 to August 10) Material and equipment deliveries and installation work will continue on all floors. Curtain wall installation will continue on all floors.