Similar Posts
How Green is the Greenmarket?
ByDonThe Times has an article about the arcane and contradictory rules governing what can and can’t be sold in the Union Square farmer’s market. Bottom line: it’s a mess.
Thrift Shopping in the Neighborhood
ByDonCheck out this list of stores.
Arthur’s Finally Closes
ByDonThe retail operation of Arthur’s Invitations has finally closed on 13th St. They are now using the basement for their custom work. What will replace Arthur’s at street level. That is unknown.
Latest New School Construction Update
ByDonIn response to community concerns about the time in the evening we end our concrete placing, DOB has granted our request to start placing our concrete at 6am, which will allow us to finish this work earlier in the evening. We have 10 more instances like this until we finish our superstructure in early June.
Therefore next week (April 2 to April 6), Superstructure work will continue at the 9th and 10th floor levels. Wednesday, April 4th, we will have an identical pour with a 6 am start time and similar end time, weather permitting. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.
The following week (April 9 to April 13), we will continue superstructure concrete and slabs on the 10th and 11th floor levels. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.
This weekend the site will be open on Saturday, March 31st for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork and concrete, plumbing and electrical work, rebar for concrete placement, using the crane and equipment to support all activities.
Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise.
In addition to the normal work on the job site, the 14th St. Con Ed Vault utility connection street work will continue per DOT Permit granted for weekends only.
Give Your Opinion About Union Square
ByDonCare to opine about how you feel about Union Square issues?
Take the Union Square Partnership’s 10-minute survey, and you will be entered into a raffle to win a $50 gift card to a local business of your choice.
New Laundry Machines, the Details
ByDonSebco Laundry will no longer be accepting pre-paid cards to use the machines in our buildings. They are switching to an app which is called My Magic Pass. Residents will need to download the app and use the site code 7–11 EAST 13TH STREET.
You will be able to pay for use of the machines by using the app. Directions on how to use the app are posted in each laundry room.
If residents have money on their current cards Damian will provide an envelope to mail to Sebco to get refunded. Please let us know if you need an envelope. THere are also envelopes available in the laundry rooms.

