Stop Caliente Cab Co., If You Dislike the Idea of It

The East 12th and 13th Street Block Association is fighting against the arrival of Caliente Cab Co. at University and 12th on the grounds that they expect it to be a noisy all-night boozefest. The owners had petitioned for 4AM closing 7 nights a week, open windows, and sidewalk cafe. They’ve backed off, but that’s still not good enough for those who are against it.

You can speak your mind at the licensing meeting on April 12th at 6PM at 268 Mulberry St.

The complete Community Board meeting is APril 21st at 6PM at 116 West 11th St.

Similar Posts

  • Here Comes the Nutella Cafe

    (PRNewsfoto/Ferrero)

    From the press release:

    Soon New Yorkers, known for their culinary palettes, will be able to enjoy the taste of Nutella® in a variety of unique dishes tailored especially for them. Ferrero, a global confectionery company and the maker of Nutella® The Original Hazelnut Spread®, today announced it will be opening a Nutella Cafe at 13th Street and University Place, near Union Square, by the end of the year. Nutella Cafe New York will feature a Nutella-inspired cafe menu and specialty espresso beverages. The first Nutella Cafe opened on May 31, 2017 in Chicago.

    “There truly is nothing like the taste of Nutella® hazelnut spread, and with the overwhelmingly positive reaction to Nutella Cafe Chicago, we know our fans feel the same way. It’s their excitement that propelled us to open another Nutella Cafe and continue to showcase the uniqueness and versatility of this beloved product,” said Rick Fossali, vice president of operations, Nutella Cafe.

    “Nutella is global power brand and the popularity of the spread is built on Ferrero’s uncompromising focus on quality ingredients. As a multicultural epi-center, New York gives us the opportunity to explore and offer new ways for our local fans to enjoy Nutella, while reaching millions of tourists visiting the city,” added Fossali.

    For more information and updates on the Nutella Cafe New York, please check out the Nutella USA Facebook, Twitter and Instagram pages.

     

  • An Important Zoning Change Could Make the Area More… Lively?

    Zoning changes around Union Square, specifically to OUR zone, C6, are designed to make it easier for a wider variiety of businesses to set up shop at the ground floor level and above. The details are here. For example,

    • Arcades

    • Axe-throwing

    • Billiards/pool halls

    • Bowling alleys

    • Escape rooms

    • Golf simulator driving range

    • Indoor go-karts

    • Indoor skateboard park

    • Interactive or virtual reality attractions

    • Laser tag

    • Miniature golf

    • Observation towers

    • Ping pong/table tennis

    • Play spaces/family fun centers

    • Wax figure exhibitions

    • Seasonally: haunted houses and similar fright attractions

    • Comedy shows

    • Concerts

    • Dancing

    • Open-mic night or poetry reading

    • 3-D printing

    • Brewery

    • Ceramic studio

    • Jewelry making

    • Wholesale and/or large-scale bakery

    • Woodworking

    • Other food and beverage producers, such as coffee roasters, ice cream makers, and shared commercial kitchen or food business incubator space

    • Other makers

  • Latest Construction Update: More of the Same

    From The New School:

    Next week (September 19 to September 23), Contractors will continue to excavate earth and rock, and load out material. Installation of bracing rakers and line drilling will progress as well. Concrete foundation walls around the perimeter of the site and slab on grade work will continue. Interior core foundation work and underground electrical and plumbing will proceed. Contractors will be removing the interior earth ramp. DOT approved street connections to underground utilities on Fifth Avenue will progress. A small cherry picker crane will arrive on site next week, and be stationed inside the Fifth Avenue fence. This crane will remain on site for approximately two months.

    The following week (September 26 to September 30 ), we will continue with concrete foundation walls and slabs, line drilling, rock excavation, loading out, interior core foundation work, street utility connections on Fifth Avenue, and underground electrical and plumbing.

    DEP continues to repair the water main along 13th Street. As part of this work, the DEP may periodically shut water service off. This work is out of our control.

    The site will be open on Saturday, September 17th. Work hours are between 9AM and 5PM as permitted by the City. To control noise levels, work activities will be limited to the placement of formwork, plumbing and electrical work, site utility connections, waterproofing and rebar for concrete placement, and the installation of walers and braces. There will be no rock excavation, rock chopping, or hauling on Saturday.