Annual Meeting Alert
The annual meeting of shareholders will take place on June 6 at 7PM at the Seafarers and International House at 123 East 15th St., second floor.
There has been some grumbling over the fact that the city may give the pavilion at the north end of Union Square Park over to a private entity to run a restaurant in and around it. We’ll see how that turns out, but in the meantime, some renderings have been revealed.
The annual report of the Union Square Partnership is available here.
Just what we needed: another beverage outlet. Meet Argo Tea, a small chain of fancy tea shops, which will soon open a new branch in the old Dean and Deluca space on University Place. (You can sample it now at another outlet in the Flatiron Building.)
Next week (February 13 to February 17), Superstructure work will continue at 5th and 6th floor levels.
The following week (February 20 to February 24), we will continue superstructure concrete and slabs on the 5th and 6th floor levels.
This weekend the site will be open on Saturday, February 11th for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork and concrete, plumbing and electrical work, rebar for concrete placement, using the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise. Additionally 14th St. Con Ed Vault utility connection street work will continue per DOT Permit granted for weekends only.