Latest New School Construction Update

Next week (February 20 to February 24), Superstructure work will continue at 5th and 6th floor levels. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.

The following week (February 27 to March 2), we will continue superstructure concrete and slabs on the 5th and 6th floor levels. Deliveries will continue to arrive at the site. The site will not be open on Monday the 20th, Presidents’ Day holiday.

This weekend the site will be open on Saturday, February 18th for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork and concrete, plumbing and electrical work, rebar for concrete placement, using the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise.

Similar Posts

  • So Long, Joyce Leslie

    Joyce Leslie, “the store where you send your daughter to dress like a hooker,” has been gone for a while on the corner of University and 8th. A replacement has finally been named: CVS. So the neighborhood gets yet another alternative to the surly hellhounds at Duane Reade.

  • New Plans for 65 5th Ave. to Be Revealed

    If you’re curious about the plans for the New School’s new construction on our block, there will be a public presentation on February 17. Here’s how the Greenwich Village Society for Historic Presentation is billing it:

    On Wednesday, February 17 at 6:30 pm The New School (TNS) will make a public presentation of its current plans for a new development at 65 Fifth Avenue, between 13th and 14th Streets. Having originally proposed a 300-350 ft. tall building rising straight up over the entire site which would have required several zoning variances, TNS is now proposing a much smaller, 16-story, 189 ft. tall (plus mechanicals) building which will set back above the 6th floor and which conforms to the existing zoning for the site. The presentation will be similar to that which was made to GVSHP, other community groups, and elected officials in December. The plans are not yet finalized at this time, but do contain significant details about TNS’ thinking and progress on the design.

    The fact that the mass and height of the proposed building has been reduced significantly from prior proposals in a very positive development. However, GVSHP does have concerns about the metal and glass design currently being contemplated for the facade of the building. The public presentation to Community Board #2’s Institutions Committee will be an opportunity to learn more about TNS’ plans for the site, ask questions, and provide feedback about the project.

    Attend the public presentation on Wednesday, February 17th at 6:30 pm at the St. Vincent’s Hospital cafeteria on 12th Street.

  • New Laundry Machines, the Details

    Sebco Laundry will no longer be accepting pre-paid cards to use the machines in our buildings. They are switching to an app which is called My Magic Pass. Residents will need to download the app and use the site code 7–11 EAST 13TH STREET.

    You will be able to pay for use of the machines by using the app. Directions on how to use the app are posted in each laundry room.

    If residents have money on their current cards Damian will provide an envelope to mail to Sebco to get refunded. Please let us know if you need an envelope. THere are also envelopes available in the laundry rooms.