Latest New School Construction Update

DOB has granted our request to start placing our concrete at 6am, which will allow us to finish this work earlier in the evening. We have 5 more instances like this until we finish our superstructure in early June.

Therefore next week (April 23 to April 27), Superstructure work will continue at the 14th and 15th floor levels. Monday, April 23rd, and Thursday, April 26th, we will have a pour with a 6 am start time and similar end time, weather permitting. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.

The following week (April 30 to May 4), we will continue superstructure concrete and slabs on the 15th and 16th floor levels. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.

This weekend the site will be open on Saturday, April 21st for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork and concrete, plumbing and electrical work, rebar for concrete placement, using the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise.

In addition to the normal work on the job site, we will have an additional crane on site at 13th st. and 5th ave. to install the stair trusses on the west side of the building. The crane will be completely on site and should not interfere with pedestrian or automotive traffic in the area.

Similar Posts

  • Murder In Union Square

    A man allegedly went on a rampage in Union Square on September 4 and left a complete stranger dead in the process.

    Police said that the attack may have been a hate crime.

    Friends of Jeffrey Babbitt, 62, were shocked to hear about the random act of violence that left the gentle, retired train conductor in a coma, CBS 2′s Dave Carlin reported on Friday.

    “I don’t believe that. I don’t know why that happened. He is very nice,” Igor Sapozhnikov said.

    Babbitt was minding his own business as he walked through the crowd near the chess boards in Union Square when a man made a hateful announcement and began his rampage, witnesses said. “He said ‘the next white person who walks by I’m going to [expletive],’” one woman said. “His fist went in and the man’s head bobbed and he hit the ground and you could hear his skull hitting the ground.”

    The man continued his rampage before demanding to see police officers.

  • The New School Will Have a Sorta Green Roof

    The New School says of its upcoming building:

    “Although gardens are rare in a place as densely built as Manhattan, the designers of the University Center found room for a front lawn of sorts: On the setback between the seventh and eighth floors will sit the Green Roof, carpeted with a leafy green flower called sedum. And in true New School fashion, the Green Roof’s purpose is interdisciplinary, providing both decoration and a boost to sustainability. The sedum plantings help cool and heat the center by providing an extra layer of sustainable insulation. Further, sedum allows the roof to absorb 40 percent of the rain falling on the building, which reduces impact on the city’s water system. The Green Roof, which is just one part of an overall water conservation strategy for the University Center, will reduce the building’s potable water usage by 74 percent and sewer discharge by 89 percent.”

  • Latest New School Construction Update

    Next week (October 10 to October 14), contractors will continue to excavate earth and load out material. Concrete foundation walls at the South East corner of the site and slab on grade work will continue. Underground electrical and plumbing work will continue. DOT approved street connections to underground utilities on Fifth Avenue will progress. Formwork and rebar for superstructure will continue at cellar levels.

    The following week (October 17 to October 21 ), we will continue superstructure concrete and slabs, street utility connections and underground electrical and plumbing.